Skip to content
SafeForJob

RAMS by job · UK

Small wind turbine RAMS

This is not a ground mount solar RAMS. This job covers installing a small wind turbine on a named site, and the control that keeps people safe is a lift, exclusion and electrical isolation plan before the tower is stood. If the RAMS never names the drop zone, wind and who energises, a principal contractor will send it back.

Typical scope

  • A lift, exclusion and electrical isolation plan before the tower is stood as a hold point
  • The drop zone, wind and who energises named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A small wind turbine rams covers installing a small wind turbine on a named site on a named UK site. The critical control is a lift, exclusion and electrical isolation plan before the tower is stood. Write the drop zone, wind and who energises into the sequence — a pack that could describe any ground mount solar RAMS will not survive a competent review.

Primary topic: small wind turbine rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • ground mount solar RAMS reused

    Missing: a lift, exclusion and electrical isolation plan before the tower is stood.

  • Critical control buried

    The drop zone, wind and who energises belongs in the sequence.

  • Occupancy ignored

    The drop zone, wind and who energises and that someone who did not read the pack will walk the exclusion.

Example

Small wind turbine on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Installing a small wind turbine on a named site at Ward 2, Lichfield Close Care, Lichfield. Midweek shutdown 09:00–16:00. A lift, exclusion and electrical isolation plan before the tower is stood; the drop zone, wind and who energises; the drop zone, wind and who energises and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Mobile tower or scaffold
  • Electrical isolation
  • Manual handling

Method (10 steps)

  1. 1.Arrive and sign in. Arrive at Ward 2, Lichfield Close Care, Lichfield, report to the Lichfield Close site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  4. 4.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
  5. 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  6. 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  7. 7.Carry out electrical work. Carry out the electrical work on the isolated circuit to BS 7671.
  8. 8.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  9. 9.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  10. 10.Hand over and sign out. Hand over to the Lichfield Close site contact, report anything outstanding and sign out.

Main risks (4 in total)

Fall from tower or scaffold, or collapse

Residual Medium

Who: Operatives, people nearby

  • Mobile towers erected by PASMA-trained persons to the manufacturer's guide
  • Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
  • Guard rails, toe boards and brick guards in place on working platforms
  • Castors locked and outriggers fitted; never moved while occupied

Falling objects

Residual Low

Who: People below, other trades, public

  • Exclusion zone set up below the work area with barriers and signage
  • Tools tethered when working at height; materials kept away from edges
  • Banksman or second person controls the area during lifts and removals
  • Hard hats worn in the exclusion zone

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

Critical control first

Put this hold point first: a lift, exclusion and electrical isolation plan before the tower is stood.

Name the site facts

The drop zone, wind and who energises

People who did not read the pack

The named site stays in use around this small wind turbine job

What this document has to cover

This is not a ground mount solar RAMS. This job covers installing a small wind turbine on a named site, and the control that keeps people safe is a lift, exclusion and electrical isolation plan before the tower is stood. If the RAMS never names the drop zone, wind and who energises, a principal contractor will send it back.

A small wind turbine rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if a lift, exclusion and electrical isolation plan before the tower is stood is skipped on this small wind turbine job
  • Small wind turbine left open so a passer-by reaches the hazard
  • Wrong isolation so a sister small wind turbine stays live
  • Manual handling or dropped parts on this small wind turbine job
  • Weather, dust or a substance unique to installing a small wind turbine on a named site
  • The next crew inheriting an open small wind turbine hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: a lift, exclusion and electrical isolation plan before the tower is stood
  • Brief the dutyholder on the drop zone, wind and who energises
  • Set an exclusion that matches ground mount solar RAMS failing on this site
  • Do the work to the sequence that keeps a lift, exclusion and electrical isolation plan before the tower is stood first
  • Test or prove the critical control still holds
  • Handover residual small wind turbine hazards in writing

Occupancy and other people

The named site stays in use around this small wind turbine job. Write the drop zone, wind and who energises and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while installing a small wind turbine on a named site
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer small wind turbine rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a ground mount solar RAMS?
No. A small wind turbine RAMS has to name the drop zone, wind and who energises. A ground mount solar RAMS will not survive a competent review.
Can we skip a lift, exclusion and electrical isolation plan before the tower is stood?
No. A lift, exclusion and electrical isolation plan before the tower is stood is the hold point. Write it before the work step.
Who writes the drop zone, wind and who energises?
The competent person who issues this small wind turbine rams. A sticky note is not a handover.
Can AI issue this small wind turbine rams?
A tool can draft a small wind turbine pack. A competent person reviews and issues it for this site.