RAMS by job · UK
Rope access / abseil RAMS
This is not ‘a MEWP RAMS without the machine’. If the document does not name the anchors, the rescue plan and who is excluded below, it is not ready.
Typical scope
- Two-rope system
- Named anchors
- Rescue plan for this elevation
- Ground exclusion and spotter
- Tool lanyards
- Weather abort
Quick answer
A rope-access RAMS covers IRATA-style work on a named elevation: two-rope system, exclusion below, rescue, and the task you will actually do at the end of the ropes. The access system is the critical control.
Primary topic: rope access rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
MEWP RAMS reused
No ropes, no rescue.
Rescue ‘call 999’
Not a plan for a suspended casualty.
No ground spotter on a shopfront
Public in the drop zone.
Example
Abseil inspection of a tower elevation
Built from one job description. You review and adjust every item before issuing it.
Job description
IRATA inspection of the west elevation at Harbour Tower, Poole. Independent anchors as designed, two-rope, tool lanyards, ground exclusion on the car-park loop with a spotter, rescue plan briefed, wind abort 25 mph.
Activities identified
- General site work
- Mobile tower or scaffold
Method (5 steps)
- 1.Arrive and sign in. Arrive at Harbour Tower, Poole, report to the Harbour Tower RTM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Harbour Tower RTM site contact, report anything outstanding and sign out.
Main risks (2 in total)
Fall from tower or scaffold, or collapse
Residual MediumWho: Operatives, people nearby
- Mobile towers erected by PASMA-trained persons to the manufacturer's guide
- Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
- Guard rails, toe boards and brick guards in place on working platforms
- Castors locked and outriggers fitted; never moved while occupied
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
What to get right on this document
Two ropes, always
Work and backup.
Rescue is rehearsed
For this building, this team.
Below is hard exclusion
Spotter, not cones alone.
What this document has to cover
This is not ‘a MEWP RAMS without the machine’. If the document does not name the anchors, the rescue plan and who is excluded below, it is not ready.
A rope access rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Fall from height on a failed or single-rope system
- Dropped tools striking the public
- Anchor or structure failure
- Unable to rescue a suspended casualty
- Weather — wind, lightning, wet stone
- Public or building users at the base
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm IRATA (or equivalent) team, independent anchors and a written rescue
- Set a hard exclusion at ground and at roof edge; lanyard tools
- Rig two-rope systems; pre-use inspect
- Complete the task; stop for weather or public breach
- Recover, inspect kit, stand down the exclusion
- Do not improvise a single-rope ‘quick drop’
Occupancy and other people
High streets and hospital loops have people who walk into exclusions. A spotter at ground is often the control that matters, plus a rescue that works for this elevation — not a generic poster.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Task chemicals (paints, cleaners, bird gel) as applicable
- None from the ropes themselves
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer rope access rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeRoofing RAMSCreate a roofing RAMS online covering edge protection, fragile roofs, falling objects and weather. Suggested controls and method you review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is IRATA required?
- Competence is required; IRATA is the usual evidence on complex structures.
- Can I combine with a MEWP RAMS?
- Only if this visit actually uses both — do not list kit you will not have.
- Bird-dropping COSHH?
- If you clean, attach it; inspection-only may still need hygiene.
- Who owns the anchors?
- The design and inspection of fixed anchors is a client/structural issue — do not guess.