Roof lantern RAMS
The opening is a hole in the building until the lantern is weathered. A skylight RAMS from a pitched roof, or a glazing RAMS that never mentions the roof opening, is the wrong document.
Typical scope
- Immediate guard on the opening
- Room below excluded
- Same-shift weather
- Glass handling plan
- Structure confirmed
- Cover ready for weather abort
Quick answer
A roof-lantern RAMS covers forming an opening in a flat roof and installing a lantern or rooflight. Falls through the opening, glass handling and same-day weather are the critical controls.
Primary topic: roof lantern rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Window RAMS reused
No roof opening.
Hole left over lunch in a kitchen
A fall and a flood.
Unit slid across a felt roof
No handling plan.
Example
Kitchen lantern on an occupied house
Built from one job description. You review and adjust every item before issuing it.
Job description
Install a 2 × 1.2 m lantern over the kitchen at 9 The Grove, Cheltenham. Structure checked, room excluded, opening guarded immediately, two-person glass lift from the scaffold, weathered before 15:00, family using the front rooms.
Activities identified
- General site work
- Mobile tower or scaffold
- Manual handling
Method (7 steps)
- 1.Arrive and sign in. Arrive at 9 The Grove, Cheltenham, report to the Private homeowner site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Private homeowner site contact, report anything outstanding and sign out.
Main risks (3 in total)
Fall from tower or scaffold, or collapse
Residual MediumWho: Operatives, people nearby
- Mobile towers erected by PASMA-trained persons to the manufacturer's guide
- Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
- Guard rails, toe boards and brick guards in place on working platforms
- Castors locked and outriggers fitted; never moved while occupied
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Guard the hole now
Minutes, not a snag.
Weather the same shift
Cover if you abort.
Below is occupied
Tell them.
What this document has to cover
The opening is a hole in the building until the lantern is weathered. A skylight RAMS from a pitched roof, or a glazing RAMS that never mentions the roof opening, is the wrong document.
A roof lantern rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Fall through the new opening or the existing fragile roof
- Glass or the lantern falling into the room or over the eaves
- Water into the building
- Manual handling of a sealed unit on a roof
- Hot works on upstands if specified
- Occupants in the room below an open hole
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the structure, edge protection around the opening, and a cover that can go on in minutes
- Exclude the room below; protect finishes
- Form the opening; immediately guard it
- Land the lantern with a handling plan; weather the same shift
- Internal linings and any electrical blinds as specified
- Remove offcuts via the planned route, not through the hole
Occupancy and other people
Kitchens and classrooms sit under lanterns. Do not leave an open hole over lunch, and write who is told in the room below.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Silicone and membranes
- Solvent cleaners on glass
- Existing roof — survey for asbestos felt
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer roof lantern rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeRoofing RAMSCreate a roofing RAMS online covering edge protection, fragile roofs, falling objects and weather. Suggested controls and method you review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a skylight on a pitch?
- A pitched skylight is a different opening and flashing — do not reuse blindly.
- Electric blind?
- Add isolation and a ceiling access; do not hide it.
- Can I store the unit in the kitchen?
- Not if it blocks escape or the hole.
- Building control?
- Usually yes for a new opening — the RAMS does not replace that.