RAMS by job · UK
Resin flooring RAMS
Resin is COSHH and a slip until it cures. A floor-grind RAMS that never mentions isocyanates, MMA odour, or a no-go period for other trades will not pass a food-factory or hospital client.
Typical scope
- Named system and COSHH
- Extract on grind
- Ignition control for MMA
- Cure exclusion
- Ventilation path
- Adjacent occupancy briefing
Quick answer
A resin flooring RAMS covers preparing a slab and applying epoxy, PU or MMA systems on a named floor. Vapour, skin sensitisation, ignition of MMA, and occupancy of adjacent rooms are the critical harms.
Primary topic: resin flooring rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Paint RAMS reused
No grind, no sensitiser, no cure window.
MMA on a school day
Odour in classrooms.
Other trades in wet resin
No barrier.
Example
Production-hall epoxy over a weekend
Built from one job description. You review and adjust every item before issuing it.
Job description
Grind and lay a solvent-free epoxy in Hall 2 at Orion Fulfilment, Doncaster, Friday 18:00–Sunday 16:00. On-tool extract, isocyanate COSHH not applicable (epoxy), hall excluded, adjacent picking told, walk-on Monday 06:00.
Activities identified
- General site work
- Hot works
- Power tools
- Using chemicals or products
Method (8 steps)
- 1.Arrive and sign in. Arrive at Hall 2, Orion Fulfilment, Doncaster, report to the Orion Fulfilment site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Obtain hot works permit. Obtain a hot works permit from the site. Remove or protect combustibles and place an extinguisher at the point of work.
- 4.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 5.Braze joints. Braze joints under the hot works permit with nitrogen purge. Maintain the fire watch during and after the work.
- 6.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Orion Fulfilment site contact, report anything outstanding and sign out.
Main risks (5 in total)
Fire from hot works
Residual MediumWho: Operatives, building occupants
- Use cold-work methods (press-fit, mechanical joints) instead of hot works where possible
- Hot works permit obtained from the site before starting
- Combustibles removed or protected with fire-resistant blankets
- Suitable fire extinguisher at the point of work
- Fire watch maintained during work and for at least 60 minutes after finishing
- Fire-resistant gloves and eye/face protection
Fumes from hot works
Residual MediumWho: Operatives, people nearby
- Work in well-ventilated areas; local exhaust ventilation for welding
- Keep the head out of the fume plume
- Suitable RPE (face-fit tested) where ventilation isn't adequate
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
+ 1 more risks in the full RAMS.
What to get right on this document
Name the chemistry
Epoxy vs PU vs MMA change everything.
The floor is closed
Until walk-on time.
Ventilate away from people
Not into the ward.
What this document has to cover
Resin is COSHH and a slip until it cures. A floor-grind RAMS that never mentions isocyanates, MMA odour, or a no-go period for other trades will not pass a food-factory or hospital client.
A resin flooring rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Inhalation and skin sensitisation from epoxy, isocyanates or MMA vapours
- Fire and explosion risk with MMA / solvents
- Silica from grinding the slab
- Slips on wet resin
- Other trades walking the cure
- Odour affecting patients, pupils or food production next door
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree the system, ventilation, ignition control and a cure window with no other trades
- Grind with on-tool extract; clean the slab
- Mix and apply to the COSHH; spill kit ready
- Exclude the floor until walk-on time; sign and barrier
- Ventilate away from occupied rooms and air intakes
- Handover cure time, cleaning regime and unused chemical waste
Occupancy and other people
Food factories, hospitals and schools cannot absorb MMA odour on a production day. Write the outage, the ventilation path, and who is told on adjacent floors.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Epoxy resins and hardeners
- Isocyanates if PU
- MMA if used
- Silica from grind
- Solvents
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer resin flooring rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFlooring RAMSCreate floor preparation method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is an SDS enough?
- No — task, duration and who is exposed. SDS ≠ COSHH.
- MMA vs epoxy?
- MMA is typically stronger odour and ignition; do not mix the methods.
- Food factory?
- Hygiene zoning and odour into production are extra occupancy controls.
- Can I grind dry without extract?
- Not as a convenience — silica is the harm.