Refuge evac chair RAMS

This is not a disabled refuge RAMS. This job covers installing refuge-point equipment or an evac chair on an occupied stair, and the control that keeps people safe is a fire-strategy and a stair-occupancy plan before the stair is blocked. If the RAMS never names which stair stays live, escape and the occupier, a principal contractor will send it back.

Typical scope

  • A fire-strategy and a stair-occupancy plan before the stair is blocked as a hold point
  • Which stair stays live, escape and the occupier named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A refuge evac chair rams covers installing refuge-point equipment or an evac chair on an occupied stair on a named UK site. The critical control is a fire-strategy and a stair-occupancy plan before the stair is blocked. Write which stair stays live, escape and the occupier into the sequence — a pack that could describe any disabled refuge RAMS will not survive a competent review.

Primary topic: refuge evac chair rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • disabled refuge RAMS reused

    Missing: a fire-strategy and a stair-occupancy plan before the stair is blocked.

  • Critical control buried

    Which stair stays live, escape and the occupier belongs in the sequence.

  • Occupancy ignored

    Which stair stays live, escape and the occupier and that someone who did not read the pack will walk the exclusion.

Example

Refuge evac chair on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Installing refuge-point equipment or an evac chair on an occupied stair at Block B, Ilkley Moor School, Ilkley. Night 21:00–05:30. A fire-strategy and a stair-occupancy plan before the stair is blocked; which stair stays live, escape and the occupier; which stair stays live, escape and the occupier and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Manual handling
  • Occupied premises or public areas
  • Lone working

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Block B, Ilkley Moor School, Ilkley, report to the Ilkley Moor School site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Ilkley Moor School site contact, report anything outstanding and sign out.

Main risks (3 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Members of the public and building occupants

Residual Low

Who: Public, customers, staff, residents

  • Work area segregated with barriers and clear signage
  • Work timed for quieter periods where possible, agreed with the site
  • Tools and materials never left unattended in public areas
  • Site contact informed of work areas and any disruption

Lone working

Residual Low

Who: Lone operatives

  • Higher-risk tasks (work at height, live work, confined spaces) not carried out alone
  • Check-in procedure agreed with the office at set times
  • Mobile phone charged and signal checked on arrival

What to get right on this document

Critical control first

Put this hold point first: a fire-strategy and a stair-occupancy plan before the stair is blocked.

Name the site facts

Which stair stays live, escape and the occupier

People who did not read the pack

The named site stays in use around this refuge evac chair job

What this document has to cover

This is not a disabled refuge RAMS. This job covers installing refuge-point equipment or an evac chair on an occupied stair, and the control that keeps people safe is a fire-strategy and a stair-occupancy plan before the stair is blocked. If the RAMS never names which stair stays live, escape and the occupier, a principal contractor will send it back.

A refuge evac chair rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if a fire-strategy and a stair-occupancy plan before the stair is blocked is skipped on this refuge evac chair job
  • Refuge evac chair left open so a passer-by reaches the hazard
  • Wrong isolation so a sister refuge evac chair stays live
  • Manual handling or dropped parts on this refuge evac chair job
  • Weather, dust or a substance unique to installing refuge-point equipment or an evac chair on an occupied stair
  • The next crew inheriting an open refuge evac chair hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: a fire-strategy and a stair-occupancy plan before the stair is blocked
  • Brief the dutyholder on which stair stays live, escape and the occupier
  • Set an exclusion that matches disabled refuge RAMS failing on this site
  • Do the work to the sequence that keeps a fire-strategy and a stair-occupancy plan before the stair is blocked first
  • Test or prove the critical control still holds
  • Handover residual refuge evac chair hazards in writing

Occupancy and other people

The named site stays in use around this refuge evac chair job. Write which stair stays live, escape and the occupier and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while installing refuge-point equipment or an evac chair on an occupied stair
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer refuge evac chair rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a disabled refuge RAMS?
No. A refuge evac chair RAMS has to name which stair stays live, escape and the occupier. A disabled refuge RAMS will not survive a competent review.
Can we skip a fire-strategy and a stair-occupancy plan before the stair is blocked?
No. A fire-strategy and a stair-occupancy plan before the stair is blocked is the hold point. Write it before the work step.
Who writes which stair stays live, escape and the occupier?
The competent person who issues this refuge evac chair rams. A sticky note is not a handover.
Can AI issue this refuge evac chair rams?
A tool can draft a refuge evac chair pack. A competent person reviews and issues it for this site.