RAMS by job · UK
Rainwater harvesting RAMS
This is a non-potable water system, not a water-butt. A plumbing RAMS that never mentions marking outlets, backflow or a buried tank as a confined space will fail building control and the water inspector.
Typical scope
- Backflow protection
- Non-potable labels on every outlet
- No unplanned tank entry
- Loft/excavation as designed
- Flush at handover
- Caretaker brief
Quick answer
A rainwater-harvesting RAMS covers installing a tank, filters, pump and labelled outlets on a named site. Excavation or loft loading, non-potable cross-connection and confined access to the tank dominate.
Primary topic: rainwater harvesting rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Butt RAMS reused
No backflow, no labels.
Someone in the tank to ‘wipe it out’
No entry plan.
WC tap looking like drinking water
Cross-connection waiting.
Example
School yard underground tank
Built from one job description. You review and adjust every item before issuing it.
Job description
Install a buried rainwater tank serving WCs at Millfield Primary, Norwich. CAT, shoring, no man-entry, type-AA air gap as specified, purple pipe, every outlet labelled, caretaker briefed, playground fenced until backfilled.
Activities identified
- General site work
- Manual handling
- Confined space
Method (7 steps)
- 1.Arrive and sign in. Arrive at Millfield Primary, Norwich, report to the Millfield Primary site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Confined space permit and gas test. Obtain the permit to work, test the atmosphere and confirm rescue arrangements before anyone enters.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Millfield Primary site contact, report anything outstanding and sign out.
Main risks (2 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Confined space
Residual MediumWho: Operatives, rescuers
- Avoid entry — do the work from outside where possible
- Permit to work and confined space trained operatives
- Atmosphere tested before and during entry with a calibrated gas monitor
- Emergency rescue arrangements in place before entry
What to get right on this document
Never connect to drinking
Labels and backflow.
Tanks are confined spaces
Do not enter on this page.
The caretaker must understand
Brief, not a leaflet in a drawer.
What this document has to cover
This is a non-potable water system, not a water-butt. A plumbing RAMS that never mentions marking outlets, backflow or a buried tank as a confined space will fail building control and the water inspector.
A rainwater harvesting rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Cross-connection of rainwater into a drinking outlet
- Excavation collapse or a loft tank overloading joists
- Confined-space entry into a buried tank
- Electric shock on a wet pump package
- Stagnant water and biological growth at handover
- Public at an open tank excavation
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the design, backflow protection and that every outlet will be labelled non-potable
- Set excavation or loft loading as designed; CAT if buried
- Install tank, filters and pump; do not enter the tank without a confined-space plan
- Connect only to the specified non-potable points
- Commission, label, and flush as specified
- Hand over the do-not-drink brief and isolation
Occupancy and other people
Schools will put a child’s mouth on a tap. Write labels, coloured pipe and a briefing of the caretaker — not a sticker in the van.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Stored rainwater (biological)
- Filter media
- Pump oils if a packaged set
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer rainwater harvesting rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradePlumbing RAMSCreate plumbing and heating RAMS online: boiler swaps, pipework, unvented cylinders and drain-downs. Suggested risks and method steps, reviewed by you.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsPlumbing method statementWrite a plumbing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is harvested water drinking water?
- No. Design it so it cannot be.
- Do I need a water-regs inspection?
- Often yes — this page is not that application.
- Loft tank instead?
- Add structural loading and overflow route; still label non-potable.
- Mosquitoes / stagnation?
- Commission the turnover; do not hand over a dead tank in July.