Piling RAMS
Piling is not ‘excavation with a bigger machine’. Stability of the rig, flying augers, concrete splash and neighbours who will feel every blow have to be in the sequence.
Typical scope
- Working platform design
- Service drawings
- Rig exclusion
- Neighbour hours and vibration
- Washout bay
- Pile records
Quick answer
A piling RAMS covers driven, CFA or similar piles on a named site: rig stability, exclusion, noise/vibration, spoil and concrete. The rig and the people around it are the critical interface.
Primary topic: piling rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
No platform design
Rig on made ground.
Auger swinging over the pavement
No exclusion.
Washout in a gully
Pollution.
Example
CFA piles on a tight infill
Built from one job description. You review and adjust every item before issuing it.
Job description
Install CFA piles for a three-storey frame at 4 Dock Lane, Bristol. Designed piling mat, CAT and drawings, exclusion from the pavement, wagons marshalled in the compound, vibration monitor at the neighbour’s wall, washout bay only.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at 4 Dock Lane, Bristol, report to the Dock Lane Developments site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Dock Lane Developments site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Platform is temporary works
Do not guess the ground.
The swing is the danger
Exclusion at the radius.
Records are part of the job
Not a Monday email.
What this document has to cover
Piling is not ‘excavation with a bigger machine’. Stability of the rig, flying augers, concrete splash and neighbours who will feel every blow have to be in the sequence.
A piling rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Rig overturn or collapse of working platform
- Struck by auger, cage or concrete line
- Noise and vibration harming neighbours and the crew
- Spoil, bentonite or concrete in the eyes and on the skin
- Services and unknown ground
- Public at a tight urban boundary
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm piling platform design, service drawings and neighbour notifications
- Set exclusion around the rig swing and concrete wagon
- Install piles to the designed sequence — no unplanned extra depth
- Cage, concrete and break-down as specified; wash out only in the bay
- Monitor vibration/noise if the project requires it
- Hand over pile records and make the platform safe for the next trade
Occupancy and other people
Urban infill sits against occupied homes and pavements. Write the hours, the exclusion and who talks to neighbours when vibration exceeds the project limits.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Wet concrete
- Bentonite or polymer support fluids if used
- Diesel and hydraulic oil
- Cement dust
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer piling rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Driven vs CFA?
- Write the actual method — noise, flying debris and support fluid change.
- Do I need a separate concrete RAMS?
- You can combine if splash, washout and burns are in this sequence.
- UXO / contamination?
- Surveys first; this RAMS does not start blind.
- What about CFA spoil?
- It is waste — skip route and COSHH if it is cementitious.