Temporary pedestrian tunnel RAMS
This is not a hoarding RAMS. This job covers erecting a temporary pedestrian tunnel on a live street, and the control that keeps people safe is a traffic and temporary-works plan before the first unit is stood. If the RAMS never names the remaining carriageway, wind and who still walks, a principal contractor will send it back.
Typical scope
- A traffic and temporary-works plan before the first unit is stood as a hold point
- The remaining carriageway, wind and who still walks named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A temporary pedestrian tunnel rams covers erecting a temporary pedestrian tunnel on a live street on a named UK site. The critical control is a traffic and temporary-works plan before the first unit is stood. Write the remaining carriageway, wind and who still walks into the sequence — a pack that could describe any hoarding RAMS will not survive a competent review.
Primary topic: temporary pedestrian tunnel rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
hoarding RAMS reused
Missing: a traffic and temporary-works plan before the first unit is stood.
Critical control buried
The remaining carriageway, wind and who still walks belongs in the sequence.
Occupancy ignored
The remaining carriageway, wind and who still walks and that someone who did not read the pack will walk the exclusion.
Example
Temporary pedestrian tunnel on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Erecting a temporary pedestrian tunnel on a live street at Spinning floor, Keighley Mills, Keighley. Holiday week, staff return Friday. A traffic and temporary-works plan before the first unit is stood; the remaining carriageway, wind and who still walks; the remaining carriageway, wind and who still walks and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Spinning floor, Keighley Mills, Keighley, report to the Keighley Mills FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Keighley Mills FM site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Critical control first
Put this hold point first: a traffic and temporary-works plan before the first unit is stood.
Name the site facts
The remaining carriageway, wind and who still walks
People who did not read the pack
The named site stays in use around this temporary pedestrian tunnel job
What this document has to cover
This is not a hoarding RAMS. This job covers erecting a temporary pedestrian tunnel on a live street, and the control that keeps people safe is a traffic and temporary-works plan before the first unit is stood. If the RAMS never names the remaining carriageway, wind and who still walks, a principal contractor will send it back.
A temporary pedestrian tunnel rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if a traffic and temporary-works plan before the first unit is stood is skipped on this temporary pedestrian tunnel job
- Temporary pedestrian tunnel left open so a passer-by reaches the hazard
- Wrong isolation so a sister temporary pedestrian tunnel stays live
- Manual handling or dropped parts on this temporary pedestrian tunnel job
- Weather, dust or a substance unique to erecting a temporary pedestrian tunnel on a live street
- The next crew inheriting an open temporary pedestrian tunnel hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: a traffic and temporary-works plan before the first unit is stood
- Brief the dutyholder on the remaining carriageway, wind and who still walks
- Set an exclusion that matches hoarding RAMS failing on this site
- Do the work to the sequence that keeps a traffic and temporary-works plan before the first unit is stood first
- Test or prove the critical control still holds
- Handover residual temporary pedestrian tunnel hazards in writing
Occupancy and other people
The named site stays in use around this temporary pedestrian tunnel job. Write the remaining carriageway, wind and who still walks and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while erecting a temporary pedestrian tunnel on a live street
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer temporary pedestrian tunnel rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeHighways RAMSCreate street works method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsStreet works method statementWrite a street works method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a hoarding RAMS?
- No. A temporary pedestrian tunnel RAMS has to name the remaining carriageway, wind and who still walks. A hoarding RAMS will not survive a competent review.
- Can we skip a traffic and temporary-works plan before the first unit is stood?
- No. A traffic and temporary-works plan before the first unit is stood is the hold point. Write it before the work step.
- Who writes the remaining carriageway, wind and who still walks?
- The competent person who issues this temporary pedestrian tunnel rams. A sticky note is not a handover.
- Can AI issue this temporary pedestrian tunnel rams?
- A tool can draft a temporary pedestrian tunnel pack. A competent person reviews and issues it for this site.