MVHR installation RAMS

MVHR is not ‘a fan in the loft’. You are running ducts through fire-resisting ceilings, working in occupied lofts, and leaving a ventilation system that must actually balance.

Typical scope

  • Loft boarding before crawling
  • Fire-stop same visit
  • Electrical isolation
  • Commissioned airflow
  • Filters fitted
  • Occupier brief

Quick answer

An MVHR installation RAMS covers fitting a mechanical ventilation with heat-recovery unit, ducts and terminals in a named dwelling or school. Ceiling access, electrical isolation, and commissioning airflow are the usual controls.

Primary topic: mvhr installation rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Fan RAMS reused

    No ducts, fire-stop or commissioning.

  • Penetrations left open

    Fire strategy.

  • Filters in the van

    System handed over empty.

Example

Plot 18 MVHR first and second fix

Built from one job description. You review and adjust every item before issuing it.

Job description

Install an MVHR unit and ducts in Plot 18, Willow Grange, Kettering. Boards in the loft, fire-stop at the party wall, isolate the local supply, commission to design rates, filters in, occupier handover sheet.

Activities identified

  • General site work
  • Manual handling

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Plot 18, Willow Grange, Kettering, report to the Willow Grange Developments site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  4. 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the Willow Grange Developments site contact, report anything outstanding and sign out.

Main risks (1 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

Board the loft first

Same control as insulation work.

Fire-stop ducts

A step, not a snag.

Commission to numbers

Not ‘it feels like it’s running’.

What this document has to cover

MVHR is not ‘a fan in the loft’. You are running ducts through fire-resisting ceilings, working in occupied lofts, and leaving a ventilation system that must actually balance.

A mvhr installation rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Falls through loft ceilings or from loft hatches
  • Electric shock on isolators and local supplies
  • Dust and unknown services in voids
  • Fire-stopping of duct penetrations left open
  • Manual handling of units in tight lofts
  • Live indoor air quality if filters are left out at handover

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Survey routes, fire-stopping and loft boarding before anyone crawls
  • Isolate electrical supplies; protect the rooms below
  • Install the unit, ducts and terminals; fire-stop as you go
  • Wire, test and commission airflow to the design figures
  • Fit filters, label, and brief the occupier on maintenance
  • Remove packaging from the loft the same visit

Occupancy and other people

Housing plots and school classrooms stay in use. Do not block trickle or existing extract without the new system running, or you leave a moisture and IAQ problem overnight.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Duct sealants and solvents
  • Mineral wool if acoustically wrapping
  • Dust from cuttings

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer mvhr installation rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a kitchen extract?
No — heat recovery, filters and whole-dwelling air paths are different.
Do I need F-gas?
Not for typical MVHR. Do not copy a VRF RAMS.
School plant-room MVHR?
Add plant-room access and occupied-classroom commissioning hours.
Condensate?
Include the drain route so you do not flood the ceiling.