MVHR installation RAMS
MVHR is not ‘a fan in the loft’. You are running ducts through fire-resisting ceilings, working in occupied lofts, and leaving a ventilation system that must actually balance.
Typical scope
- Loft boarding before crawling
- Fire-stop same visit
- Electrical isolation
- Commissioned airflow
- Filters fitted
- Occupier brief
Quick answer
An MVHR installation RAMS covers fitting a mechanical ventilation with heat-recovery unit, ducts and terminals in a named dwelling or school. Ceiling access, electrical isolation, and commissioning airflow are the usual controls.
Primary topic: mvhr installation rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Fan RAMS reused
No ducts, fire-stop or commissioning.
Penetrations left open
Fire strategy.
Filters in the van
System handed over empty.
Example
Plot 18 MVHR first and second fix
Built from one job description. You review and adjust every item before issuing it.
Job description
Install an MVHR unit and ducts in Plot 18, Willow Grange, Kettering. Boards in the loft, fire-stop at the party wall, isolate the local supply, commission to design rates, filters in, occupier handover sheet.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Plot 18, Willow Grange, Kettering, report to the Willow Grange Developments site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Willow Grange Developments site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Board the loft first
Same control as insulation work.
Fire-stop ducts
A step, not a snag.
Commission to numbers
Not ‘it feels like it’s running’.
What this document has to cover
MVHR is not ‘a fan in the loft’. You are running ducts through fire-resisting ceilings, working in occupied lofts, and leaving a ventilation system that must actually balance.
A mvhr installation rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Falls through loft ceilings or from loft hatches
- Electric shock on isolators and local supplies
- Dust and unknown services in voids
- Fire-stopping of duct penetrations left open
- Manual handling of units in tight lofts
- Live indoor air quality if filters are left out at handover
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Survey routes, fire-stopping and loft boarding before anyone crawls
- Isolate electrical supplies; protect the rooms below
- Install the unit, ducts and terminals; fire-stop as you go
- Wire, test and commission airflow to the design figures
- Fit filters, label, and brief the occupier on maintenance
- Remove packaging from the loft the same visit
Occupancy and other people
Housing plots and school classrooms stay in use. Do not block trickle or existing extract without the new system running, or you leave a moisture and IAQ problem overnight.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Duct sealants and solvents
- Mineral wool if acoustically wrapping
- Dust from cuttings
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer mvhr installation rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeHVAC RAMSCreate HVAC and refrigeration RAMS online: rooftop units, split systems, refrigerant recovery and brazing. Suggested risks and method steps you review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a kitchen extract?
- No — heat recovery, filters and whole-dwelling air paths are different.
- Do I need F-gas?
- Not for typical MVHR. Do not copy a VRF RAMS.
- School plant-room MVHR?
- Add plant-room access and occupied-classroom commissioning hours.
- Condensate?
- Include the drain route so you do not flood the ceiling.