Lightning protection RAMS
You are on the roof and at the earth pit. A domestic electrical RAMS that never mentions roof edge, exothermic welding (if used), or the air-termination layout is the wrong pack.
Typical scope
- Roof access named
- Storm abort
- Design followed
- Earth-pit hot works if any
- Test results recorded
- Public below
Quick answer
A lightning protection RAMS covers installing or testing air terminals, down conductors and earths on a named building. Height on the roof, drilling into the structure, and live electrical bonding are the usual controls.
Primary topic: lightning protection rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
EICR RAMS reused
No roof or earth pit.
Working through a black cloud
No abort.
Free-climbing the parapet
No edge protection.
Example
Church tower air terminals
Built from one job description. You review and adjust every item before issuing it.
Job description
Install air terminals and a down conductor on St Mary’s tower, Durham. Independent scaffold, lightning-storm abort, public exclusion at the west door, earth pit with exothermic weld under hot-works permit, test results to the DAC.
Activities identified
- General site work
- Mobile tower or scaffold
- Hot works
- Manual handling
- Occupied premises or public areas
Method (10 steps)
- 1.Arrive and sign in. Arrive at St Mary’s, Durham, report to the St Mary’s PCC site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Obtain hot works permit. Obtain a hot works permit from the site. Remove or protect combustibles and place an extinguisher at the point of work.
- 5.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 6.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Braze joints. Braze joints under the hot works permit with nitrogen purge. Maintain the fire watch during and after the work.
- 9.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 10.Hand over and sign out. Hand over to the St Mary’s PCC site contact, report anything outstanding and sign out.
Main risks (6 in total)
Fall from tower or scaffold, or collapse
Residual MediumWho: Operatives, people nearby
- Mobile towers erected by PASMA-trained persons to the manufacturer's guide
- Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
- Guard rails, toe boards and brick guards in place on working platforms
- Castors locked and outriggers fitted; never moved while occupied
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Fire from hot works
Residual MediumWho: Operatives, building occupants
- Use cold-work methods (press-fit, mechanical joints) instead of hot works where possible
- Hot works permit obtained from the site before starting
- Combustibles removed or protected with fire-resistant blankets
- Suitable fire extinguisher at the point of work
- Fire watch maintained during work and for at least 60 minutes after finishing
- Fire-resistant gloves and eye/face protection
Fumes from hot works
Residual MediumWho: Operatives, people nearby
- Work in well-ventilated areas; local exhaust ventilation for welding
- Keep the head out of the fume plume
- Suitable RPE (face-fit tested) where ventilation isn't adequate
+ 2 more risks in the full RAMS.
What to get right on this document
The roof is height
Access as for any roof job.
Storms are a stop
Written abort.
Tests are the handover
Values on a certificate, not a thumbs-up.
What this document has to cover
You are on the roof and at the earth pit. A domestic electrical RAMS that never mentions roof edge, exothermic welding (if used), or the air-termination layout is the wrong pack.
A lightning protection rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Falls from the roof or through fragile lights
- Electric shock when bonding to existing services
- Hot works or exothermic welding at earth pits
- Drilling into unknown substrates and services
- Public below when working an elevation
- Weather — do not be the highest point in a storm
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the design, roof access and a weather abort (including thunderstorms)
- Edge protection or MEWP as the access; no free-climbing parapets
- Install air terminals and down conductors; clip as designed
- Form earths; control hot works if used
- Bond, test and record values
- Remove access and brief the client on inspection intervals
Occupancy and other people
Churches, schools and warehouses have public at the perimeter. Exclusion below an elevation and a storm abort that actually stops the job are occupancy and weather controls.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Exothermic welding powders if used
- Bitumen or sealants at roof penetrations
- Solvent wipes
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer lightning protection rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Do I work in a thunderstorm to ‘test’ it?
- No. Abort.
- Is this the same as bonding a consumer unit?
- Related electrically, different access and earth electrodes.
- Lead roofs?
- Add fragile-surface and hot-works controls if you dress lead.
- Who inspects later?
- The client’s regime; your RAMS is for this install or test visit.