RAMS by job · UK
Lift motor-room power RAMS
This is not a lift maintenance RAMS. This job covers altering power or controls in a lift motor room while the lift is locked off, and the control that keeps people safe is lock-off of the lift and the motor-room supply before any cover is opened. If the RAMS never names which lift is out, the landing watch and who holds the pit/car keys, a principal contractor will send it back.
Typical scope
- Lift locked off
- Board proved dead
- Landing watch
- Second lift treated live
- Lift person restores movement
- Notices on landings
Quick answer
A lift motor room power rams covers altering power or controls in a lift motor room while the lift is locked off on a named UK site. The critical control is lock-off of the lift and the motor-room supply before any cover is opened. Write which lift is out, the landing watch and who holds the pit/car keys into the sequence — a pack that could describe any lift maintenance RAMS will not survive a competent review.
Primary topic: lift motor room power rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Generic electrical RAMS reused
No lift lock-off.
Electrician restores the lift
Wrong competence.
No landing notice
A resident forces a door.
Example
Motor-room board swap
Built from one job description. You review and adjust every item before issuing it.
Job description
Replace the motor-room board for lift A at Harbour View, Aberdeen. Lift A locked off by the lift engineer, board proved dead, lift B live in the same room, landing notices, restore only by the lift engineer Sunday 12:00.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Motor room, Harbour View, Aberdeen, report to the Harbour View Housing site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Harbour View Housing site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Two isolations
Lift and board.
The lift person restores movement
Named.
Residents are occupancy
Notices.
What this document has to cover
This is not a lift maintenance RAMS. This job covers altering power or controls in a lift motor room while the lift is locked off, and the control that keeps people safe is lock-off of the lift and the motor-room supply before any cover is opened. If the RAMS never names which lift is out, the landing watch and who holds the pit/car keys, a principal contractor will send it back.
A lift motor room power rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Electric shock on a motor-room board that also feeds a second lift
- Unexpected movement if the lift was never locked off
- Fall into an open landing or pit while you are in the motor room
- Heat and poor air in a rooftop motor room
- Other trades using the motor room as a store
- Restoring power while someone is still in the pit
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Lock the lift off with the lift competent person; isolate and prove dead the named board
- Landing watch or physical landing barriers as agreed
- Do the electrical work; treat the second lift as live if it shares the room
- Account for tools and covers
- The lift competent person restores movement — not the electrician alone
- Handover remaining defects and which lift is still out
Occupancy and other people
Residential blocks keep using the other lift. Write the out-of-service notices and that a resident will force a landing door.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Cleaning wipes
- Dust from old boards
- Hydraulic oil if the lift type uses it
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer lift motor room power rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this lift maintenance?
- Maintenance is the lift. This RAMS is the electrical supply in the motor room.
- Can lift B stay in service?
- Yes if the room method keeps people out of its kit — write it.
- Who holds pit keys?
- The lift competent person.
- Rooftop motor room heat?
- Write time limits and hydration — heat is a hazard.