RAMS by job · UK
Heritage leadwork RAMS
This is conservation craft on a live church or listed house, not a strip of flashing on a new dormer. A general roofing RAMS that never mentions lead fume, bossing, or how you protect carved stone will fail the architect.
Typical scope
- Specified lead code
- Hot-works if heat is used
- Fabric protection
- Same-day weather
- Hygiene — no food on lead
- Offcuts as waste
Quick answer
A heritage-leadwork RAMS covers dressing lead on a named historic roof: rolls, flashings or a small bay. Height, lead COSHH, hot works if used, and the fabric you must not wreck are the core.
Primary topic: heritage leadwork rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Flashing RAMS reused
No fabric, no COSHH.
Heater on dry sarking with no watch
Fire.
Grinding lead to ‘speed the boss’
Fume.
Example
Nave gutter lead on a live church
Built from one job description. You review and adjust every item before issuing it.
Job description
Dress the south nave gutter at St Oswald’s, Durham. Independent scaffold, visitors excluded at the south door, code 6 as specified, cold-dressed where possible, heater under permit with a 60-minute watch, offcuts bagged, aisle reopened after.
Activities identified
- General site work
- Roof work
- Mobile tower or scaffold
Method (7 steps)
- 1.Arrive and sign in. Arrive at St Oswald’s, Durham, report to the St Oswald’s PCC site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
- 4.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 5.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the St Oswald’s PCC site contact, report anything outstanding and sign out.
Main risks (5 in total)
Fall from roof edge
Residual MediumWho: Operatives
- Plan work to be done from below or from a MEWP where possible
- Edge protection (guard rails) or parapet of adequate height in place before work starts
- Safe access route to the roof agreed with the site; roof hatch secured open
- Where collective protection isn't possible, use a fall-restraint system with suitable anchors
- Work stops in high winds, ice or heavy rain
Fall through fragile roof or rooflight
Residual MediumWho: Operatives
- Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
- Rooflights covered or protected with suitable mesh or barriers
- Staging or crawling boards used; no walking directly on sheets
- Safety netting or fall arrest below where required
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
+ 1 more risks in the full RAMS.
What to get right on this document
The detail is the method
Code and dressing, not a smear.
Heat needs a permit
Watch after.
Lead is COSHH
Hygiene, not a biscuit on the gutter.
What this document has to cover
This is conservation craft on a live church or listed house, not a strip of flashing on a new dormer. A general roofing RAMS that never mentions lead fume, bossing, or how you protect carved stone will fail the architect.
A heritage leadwork rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Falls from a historic roof or through fragile slates
- Lead fume and ingestion from hot works or grinding
- Fire from a lead heater on dry timbers
- Damage to carved stone, glass or archaeology
- Public below an open gutter
- Weather opening a historic roof overnight
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm access, the specified code of lead, and a hot-works permit if heat is used
- Protect stone and glass; set exclusion below
- Dress to the detail; do not grind lead as a habit
- Weather every opening the same day
- Wash, no eating on the lead, bag offcuts as the waste route requires
- Clear gutters of scraps that would stain the elevation
Occupancy and other people
Churches stay open to visitors. Write the closed aisle below and that a heater on a dry nave roof is a fire watch, not a convenience.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Lead (fume and ingestion)
- Patination oil
- Fuel for lead heaters if used
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer heritage leadwork rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeRoofing RAMSCreate a roofing RAMS online covering edge protection, fragile roofs, falling objects and weather. Suggested controls and method you review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsRoofing method statementWrite a roofing method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a chimney rebuild?
- No — this is lead dressing. Use the chimney RAMS if you are striking masonry.
- Can I use flashband?
- Not on a specified heritage detail.
- Bats in the eaves?
- Wildlife sits with the client; stop if a survey is outstanding.
- Is patination oil COSHH?
- Write the task — SDS ≠ COSHH.