RAMS by job · UK
Land-drain field RAMS
This is not a french drain RAMS. This job covers installing a land-drainage field on an occupied plot, and the control that keeps people safe is service location and an open-trench plan before the first run. If the RAMS never names buried services, livestock or children and silt, a principal contractor will send it back.
Typical scope
- Service location and an open-trench plan before the first run as a hold point
- Buried services, livestock or children and silt named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A land-drain field rams covers installing a land-drainage field on an occupied plot on a named UK site. The critical control is service location and an open-trench plan before the first run. Write buried services, livestock or children and silt into the sequence — a pack that could describe any french drain RAMS will not survive a competent review.
Primary topic: land-drain field rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
french drain RAMS reused
No service location and an open-trench plan before the first run.
Critical control buried
Buried services, livestock or children and silt belongs in the sequence.
Occupancy ignored
Buried services, livestock or children and silt and that someone who did not read the pack will walk the exclusion.
Example
Land-drain field on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Installing a land-drainage field on an occupied plot at Pier store, Truro Harbour, Truro. Holiday week, staff return Friday. Service location and an open-trench plan before the first run; buried services, livestock or children and silt; buried services, livestock or children and silt and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Manual handling
- Excavation
- Occupied premises or public areas
Method (10 steps)
- 1.Arrive and sign in. Arrive at Pier store, Truro Harbour, Truro, report to the Truro Harbour FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 9.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 10.Hand over and sign out. Hand over to the Truro Harbour FM site contact, report anything outstanding and sign out.
Main risks (4 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
What to get right on this document
Critical control first
Put this hold point first: service location and an open-trench plan before the first run.
Name the site facts
Buried services, livestock or children and silt
People who did not read the pack
The named site stays in use around this land-drain field job
What this document has to cover
This is not a french drain RAMS. This job covers installing a land-drainage field on an occupied plot, and the control that keeps people safe is service location and an open-trench plan before the first run. If the RAMS never names buried services, livestock or children and silt, a principal contractor will send it back.
A land-drain field rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if service location and an open-trench plan before the first run is skipped on this land-drain field job
- Land-drain field left open so a passer-by reaches the hazard
- Wrong isolation so a sister land-drain field stays live
- Manual handling or dropped parts on this land-drain field job
- Weather, dust or a substance unique to installing a land-drainage field on an occupied plot
- The next crew inheriting an open land-drain field hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: service location and an open-trench plan before the first run
- Brief the dutyholder on buried services, livestock or children and silt
- Set an exclusion that matches french drain RAMS failing on this site
- Do the work to the sequence that keeps service location and an open-trench plan before the first run first
- Test or prove the critical control still holds
- Handover residual land-drain field hazards in writing
Occupancy and other people
The named site stays in use around this land-drain field job. Write buried services, livestock or children and silt and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while installing a land-drainage field on an occupied plot
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer land-drain field rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a french drain RAMS?
- No. A land-drain field RAMS has to name buried services, livestock or children and silt. A french drain RAMS will not survive a competent review.
- Can we skip service location and an open-trench plan before the first run?
- No. Service location and an open-trench plan before the first run is the hold point. Write it before the work step.
- Who writes buried services, livestock or children and silt?
- The competent person who issues this land-drain field rams. A sticky note is not a handover.
- Can AI issue this land-drain field rams?
- A tool can draft a land-drain field pack. A competent person reviews and issues it for this site.