RAMS by job · UK
Kitchen make-up air RAMS
This is not a kitchen canopy RAMS. This job covers installing a make-up air unit to replace extract on a live commercial kitchen, and the control that keeps people safe is isolation of the unit and a written extract interlock before anyone cooks. If the RAMS never names the interlock, the grease-laden roof and whether service continues, a principal contractor will send it back.
Typical scope
- Chef window
- Interlock as designed
- Kitchen closed
- Airflow commissioned
- Chef walk-down
- No defeated link
Quick answer
A kitchen make up air rams covers installing a make-up air unit to replace extract on a live commercial kitchen on a named UK site. The critical control is isolation of the unit and a written extract interlock before anyone cooks. Write the interlock, the grease-laden roof and whether service continues into the sequence — a pack that could describe any kitchen canopy RAMS will not survive a competent review.
Primary topic: kitchen make up air rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
kitchen canopy RAMS reused
No isolation of the unit and a written extract interlock before anyone cooks.
Critical control buried
The interlock, the grease-laden roof and whether service continues belongs in the sequence.
Occupancy ignored
The closed service and that a sous-chef will light a burner anyway.
Example
Kitchen make-up air on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Installing a make-up air unit to replace extract on a live commercial kitchen at Roof plant, Harbour Kitchen, Falmouth. Monday 00:00–06:00, service 07:00. Isolation of the unit and a written extract interlock before anyone cooks; the interlock, the grease-laden roof and whether service continues; the closed service and that a sous-chef will light a burner anyway.
Activities identified
- General site work
- Roof work
- Manual handling
Method (8 steps)
- 1.Arrive and sign in. Arrive at Roof plant, Harbour Kitchen, Falmouth, report to the Harbour Kitchen Ltd site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
- 4.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
- 5.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 8.Hand over and sign out. Hand over to the Harbour Kitchen Ltd site contact, report anything outstanding and sign out.
Main risks (5 in total)
Fall from roof edge
Residual MediumWho: Operatives
- Plan work to be done from below or from a MEWP where possible
- Edge protection (guard rails) or parapet of adequate height in place before work starts
- Safe access route to the roof agreed with the site; roof hatch secured open
- Where collective protection isn't possible, use a fall-restraint system with suitable anchors
- Work stops in high winds, ice or heavy rain
Fall through fragile roof or rooflight
Residual MediumWho: Operatives
- Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
- Rooflights covered or protected with suitable mesh or barriers
- Staging or crawling boards used; no walking directly on sheets
- Safety netting or fall arrest below where required
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
+ 1 more risks in the full RAMS.
What to get right on this document
Critical control first
Put this hold point first: isolation of the unit and a written extract interlock before anyone cooks.
Name the site facts
The interlock, the grease-laden roof and whether service continues
People who did not read the pack
Kitchens plate around you
What this document has to cover
This is not a kitchen canopy RAMS. This job covers installing a make-up air unit to replace extract on a live commercial kitchen, and the control that keeps people safe is isolation of the unit and a written extract interlock before anyone cooks. If the RAMS never names the interlock, the grease-laden roof and whether service continues, a principal contractor will send it back.
A kitchen make up air rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Electric shock on a unit that shares a kitchen board
- Gas or induction still cooking under a dead make-up unit
- Hot grease on a roof plant deck
- Dropped filters into a kitchen still plating
- Fire from an interlock left defeated
- Manual handling of a unit over a live servery
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree the kitchen-closed window with the chef
- Isolate electrical and any gas interlock; prove dead
- Land the unit; reconnect extract interlock as designed — no defeated link
- Commission airflow against the kitchen extract
- Chef walk-down before service
- Hand over interlock test sheets
Occupancy and other people
Kitchens plate around you. Write the closed service and that a sous-chef will light a burner anyway as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Grease
- Coil cleaner
- Joint compound
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kitchen make up air rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeHVAC RAMSCreate HVAC and refrigeration RAMS online: rooftop units, split systems, refrigerant recovery and brazing. Suggested risks and method steps you review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a canopy install?
- The canopy may already be there. This RAMS is the make-up air unit and the interlock.
- Can they cook on extract only?
- Only if the dutyholder allows it — write the interlock state.
- Grease on the roof?
- Treat it as a slip and a fire load.
- Who signs the interlock?
- The commissioning person named on the pack.