RAMS by job · UK
Kitchen fitting RAMS
Domestic kitchens concentrate gas, water, electricity and stone dust in a small occupied room. A generic fit-out RAMS that never mentions those services fails.
Typical scope
- Service isolation
- Stone-cutting controls
- Stair handling
- Resident briefing
- Same-day waste
- Test and relight
Quick answer
A kitchen fitting RAMS covers stripping, services, units, worktops and appliances in occupied homes or commercial kitchens. Services isolation, silica from worktops and manual handling are the core.
Primary topic: kitchen fitting rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Worktop cut in the garden without controls
Silica cloud.
Gas ‘someone else’s problem’
Not isolated.
Fridge on the stairs
No handling plan.
Example
Domestic kitchen refit
Built from one job description. You review and adjust every item before issuing it.
Job description
Refit the kitchen at 27 Maple Avenue, Nottingham. Isolate services, family remaining upstairs, quartz worktop cut outdoors with water suppression, appliances via the back door not the stairs.
Activities identified
- General site work
- Power tools
- Outdoor or exposed work
Method (5 steps)
- 1.Arrive and sign in. Arrive at 27 Maple Avenue, Nottingham, report to the Private homeowner site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Private homeowner site contact, report anything outstanding and sign out.
Main risks (3 in total)
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
What to get right on this document
Stone is COSHH
Wet cut / extract / RPE as the assessment says.
Services before units
Isolation proved.
The house is occupied
Write the family interface.
What this document has to cover
Domestic kitchens concentrate gas, water, electricity and stone dust in a small occupied room. A generic fit-out RAMS that never mentions those services fails.
A kitchen fitting rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Gas, water and electrical isolation failures
- Silica dust from cutting stone worktops
- Manual handling of units and appliances on stairs
- Sharp edges and knives
- Residents in the rest of the home
- Slips on offcuts and water
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Isolate services; prove electrical dead if altering circuits
- Protect the rest of the home and set a small exclusion in the kitchen
- Strip out and remove waste the same day
- First-fix services, then units
- Worktops cut with suppression/extract if stone; fit appliances
- Reinstate, test water/gas/electric as in competence, handover
Occupancy and other people
Families stay in the house. Keep the route to the garden or living room open and never leave open gas or live tails.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Silica from stone
- Adhesives and silicone
- Foam fillers
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kitchen fitting rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFit-out RAMSCreate a fit-out or shopfitting RAMS online: partitions, ceilings, dust, occupied premises and out-of-hours work. Reviewed by you before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Who isolates gas?
- A Gas Safe engineer — name that competence.
- Can I cut granite inside?
- Not without serious extraction; outdoor wet cutting is the usual control.
- Commercial kitchens?
- Add night work, grease and client hygiene rules.
- Electrics for the hob?
- If you alter circuits, that is electrical work — competence and isolation in the RAMS.