RAMS by job · UK
Kitchen extract cleaning RAMS
Grease is a fire load. The RAMS should treat access into ducts, chemical use and reinstatement of fire-resisting parts as the job, not a generic ‘cleaning’ paragraph.
Typical scope
- Access method named
- COSHH for cleaner
- Fire damper check
- Effluent disposal
- Permit to isolate detection
- Photo record
Quick answer
A kitchen extract cleaning RAMS covers degreasing canopies, ducts and fans — often at height, with chemicals, in live or out-of-hours kitchens. Fire load, access and COSHH are the usual critical controls.
Primary topic: kitchen extract cleaning rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Office cleaning RAMS
No height, grease or COSHH.
Detection left isolated
Fire alarm not reinstated.
Waste in the drain
Grease dumped illegally.
Example
Late-night canopy and duct clean
Built from one job description. You review and adjust every item before issuing it.
Job description
Deep-clean the kitchen extract at Market Street Brasserie, Manchester, 22:00–05:00. Isolate equipment, podium in the kitchen, roof fan access with a ladder permit, collect grease, reinstate detection.
Activities identified
- General site work
- Ladders or stepladders
- Roof work
Method (7 steps)
- 1.Arrive and sign in. Arrive at Market Street, Manchester, report to the Market Street Brasserie site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
- 4.Set up access equipment. Inspect and set up the podium or stepladder on firm, level ground in the work area.
- 5.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Market Street Brasserie site contact, report anything outstanding and sign out.
Main risks (5 in total)
Fall from ladders or stepladders
Residual MediumWho: Operatives
- Use a podium or mobile tower instead of a ladder where the task allows
- Ladders only for short-duration (under 30 minutes), light work with three points of contact
- Ladder inspected before use; industrial-grade (EN 131 professional) only
- Ladder set on firm, level ground and footed or secured
- No overreaching — move the ladder instead
Fall from roof edge
Residual MediumWho: Operatives
- Plan work to be done from below or from a MEWP where possible
- Edge protection (guard rails) or parapet of adequate height in place before work starts
- Safe access route to the roof agreed with the site; roof hatch secured open
- Where collective protection isn't possible, use a fall-restraint system with suitable anchors
- Work stops in high winds, ice or heavy rain
Fall through fragile roof or rooflight
Residual MediumWho: Operatives
- Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
- Rooflights covered or protected with suitable mesh or barriers
- Staging or crawling boards used; no walking directly on sheets
- Safety netting or fall arrest below where required
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
+ 1 more risks in the full RAMS.
What to get right on this document
Chemicals are the job
COSHH matched to the actual cleaner, not ‘detergent’.
Access into the duct
How you get there and how you get out.
Put the building back
Dampers, panels, detection.
What this document has to cover
Grease is a fire load. The RAMS should treat access into ducts, chemical use and reinstatement of fire-resisting parts as the job, not a generic ‘cleaning’ paragraph.
A kitchen extract cleaning rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Work at height in canopies and on roofs
- Chemical burns and inhalation from degreasers
- Fire from residual grease and hot equipment
- Confined or restricted duct access
- Slips on grease
- Night work in commercial kitchens
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Isolate kitchen equipment and, if needed, fire detection with permit
- Set drip protection and exclusion
- Clean canopy, filters then duct sections in order
- Clean the fan and discharge, inspect fire dampers
- Rinse, collect effluent, reinstate panels
- Handover photos and next-clean date
Occupancy and other people
Restaurants often want the kitchen back at 07:00. Write the out-of-hours method, not a daytime construction RAMS.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Alkaline degreasers
- Degreasing aerosols
- Grease waste
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kitchen extract cleaning rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeHVAC RAMSCreate HVAC and refrigeration RAMS online: rooftop units, split systems, refrigerant recovery and brazing. Suggested risks and method steps you review before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsHVAC installation method statementWrite a hvac installation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a confined space?
- Some risers are. If you cannot get out unaided, assess confined space separately.
- Do I need a hot works permit?
- Not for cleaning, but isolating a kitchen fire system usually needs a permit.
- How often?
- The RAMS is per visit; frequency is a client/insurance issue you can record.
- Can the chef stay?
- No one in the exclusion while chemicals and access equipment are in use.