RAMS by job · UK
Kerbing and channel RAMS
Kerbs are highway construction, not garden edging. A block-paving RAMS that never mentions TM, a grab on the wagon or how you stop a pram rolling into the carriageway will fail the supervisor.
Typical scope
- TM and a footway route
- Service location
- Grab or two-person lift
- Washout bay
- No overnight trip
- Lookout at crossings
Quick answer
A kerbing-and-channel RAMS covers excavating and laying kerbs, channels and ironworks on a named highway or car park. Plant, wet concrete, and the public still walking the edge are the critical harms.
Primary topic: kerbing rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Garden-edging RAMS
No TM, no grab.
Pedestrians dumped in the road
No walkway.
Washout in a gully
Pollution.
Example
Kerb race on a school route
Built from one job description. You review and adjust every item before issuing it.
Job description
Relay kerbs on Station Approach, Derby, 09:30–14:30. LANTRA TM, boarded walkway, CAT, grab lift, washout bay, no work at pick-up, ironworks to level before leaving, lookout at the crossing.
Activities identified
- General site work
- Excavation
Method (7 steps)
- 1.Arrive and sign in. Arrive at Station Approach, Derby, report to the County Highways site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 5.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the County Highways site contact, report anything outstanding and sign out.
Main risks (2 in total)
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
What to get right on this document
TM first
Then the grab.
Keep walkers on a footway
Do not gift them to traffic.
Washout is designed
A bay, not a kerb gully.
What this document has to cover
Kerbs are highway construction, not garden edging. A block-paving RAMS that never mentions TM, a grab on the wagon or how you stop a pram rolling into the carriageway will fail the supervisor.
A kerbing rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Struck by a vehicle or the kerb grab
- Manual handling and crushed fingers on concrete kerbs
- Wet-concrete burns
- Public forced into the live carriageway
- Services when excavating the race
- Slurry washed into a gully
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Set TM and a pedestrian route that stays on a footway before the first kerb is lifted
- CAT the race; excavate to line
- Lay with the grab or a two-person method — not a one-man swing
- Haunch; protect fresh work; wash out only in the bay
- Bed ironworks to level; do not leave a trip overnight
- Take down TM in reverse; leave a walkable edge
Occupancy and other people
High streets and school routes stay used. Write the boarded walkway and that children will treat kerbs as a balance beam.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Wet concrete
- Diesel from the wagon
- Mortar for ironworks
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer kerbing rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeHighways RAMSCreate street works method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsIronworks method statementWrite a ironworks method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this block paving?
- Paving is a surface. This is the edge and channel.
- Private car park?
- Still a vehicle interface — write marshals if you skip NRSWA.
- Who owns the ironworks level?
- The design — a low gully is a pond.
- Can I cut kerbs dry?
- Silica — wet-cut or extract in a bay.