Heat recovery unit RAMS

Commercial HRUs are heavy, dirty and sit on live buildings. An MVHR RAMS that never mentions a crane, a thermal wheel’s hygiene or how you keep a theatre ventilated during the swap is the wrong pack.

Typical scope

  • Lift plan
  • Ventilation outage plan
  • Filter waste bagged
  • Fire-stop ducts
  • Wheel commissioned
  • Edge protection reinstated

Quick answer

A heat-recovery-unit RAMS covers installing a commercial HRU or thermal wheel on a roof or in a plant room: the lift, duct connections, filters and the floors that must keep air. It is not a dwelling MVHR page.

Primary topic: heat recovery unit rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • MVHR dwelling RAMS reused

    No crane, no wheel hygiene.

  • Filters emptied over the car park

    Dust on the public.

  • Theatre dark and airless on a matinee

    No outage message.

Example

Roof HRU swap over a theatre

Built from one job description. You review and adjust every item before issuing it.

Job description

Replace HRU-1 on the plant deck at Lyceum Theatre, Sheffield. Sunday crane, car-park exclusion, bag filters, temporary ventilation plan for the auditorium, wheel commissioned, edge protection back before the Monday get-in.

Activities identified

  • General site work
  • Manual handling
  • Lifting operations

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Lyceum Theatre, Sheffield, report to the Lyceum Theatre Trust site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Carry out the lift. Carry out lifts to the lift plan, with the exclusion zone in place and a trained slinger/signaller directing.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Lyceum Theatre Trust site contact, report anything outstanding and sign out.

Main risks (2 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Lifting operations

Residual Medium

Who: Operatives, public, other trades

  • Lift planned by a competent person; lift plan in place
  • Lifting equipment and accessories have current LOLER thorough examination
  • Exclusion zone below the lift; nobody under suspended loads
  • Trained slinger/signaller directs the lift
  • Lifts stopped in high winds

What to get right on this document

Occupants need air

Window and message.

Filters are waste

Bagged.

The lift is planned

Radius and exclusion.

What this document has to cover

Commercial HRUs are heavy, dirty and sit on live buildings. An MVHR RAMS that never mentions a crane, a thermal wheel’s hygiene or how you keep a theatre ventilated during the swap is the wrong pack.

A heat recovery unit rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Dropped load on a plant-deck lift
  • Work at height on decks and in modules
  • Electric shock and stored energy in fans and wheels
  • Hygiene — dirty filters and a wheel that has seen kitchen or toilet air
  • Occupants losing ventilation during the outage
  • Other trades under a roof lift

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Lift plan and a ventilation strategy for the occupied floors
  • Isolate electrical and controls; bag filters as waste
  • Land the unit, connect ducts, fire-stop
  • Commission airflow and the wheel or bypass as designed
  • Fit filters; label maintenance access
  • Remove the old unit and reinstate edge protection

Occupancy and other people

Theatres and offices need air. Write the outage window and who is told if a performance or exam is on.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Old filter dust
  • Wheel-cleaning chemicals if used
  • Sealants at duct connections

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer heat recovery unit rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as dwelling MVHR?
No — commercial lift, wheel hygiene and occupied-public ventilation differ.
Kitchen extract on the same roof?
Do not cross-contaminate; write separate ducts.
Do I need F-gas?
Not for a typical air-to-air HRU. Do not copy a VRF RAMS.
Who owns the outage?
The dutyholder — name them if a show is programmed.