Ground source heat pump RAMS

This is groundworks plus a refrigeration/hydronic install. An air-source heat-pump RAMS that never mentions a drill rig, loop fusion, or glycol spill will fail the first principal contractor.

Typical scope

  • Service drawings and CAT
  • Rig or trench exclusion
  • Pressure test of loops
  • Glycol spill kit and waste
  • Electrical isolation
  • Occupier access and mud control

Quick answer

A ground source heat pump RAMS covers drilling or trenching ground loops, installing the heat pump, and charging glycol. Plant, drilling, glycol COSHH and occupied-building connections are the critical controls.

Primary topic: ground source heat pump rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • ASHP RAMS reused

    No drill, no glycol.

  • Glycol to a surface drain

    Pollution.

  • Slinky trench unshored at 1.2 m

    Collapse.

Example

Vertical boreholes for a school plant room

Built from one job description. You review and adjust every item before issuing it.

Job description

Drill closed-loop bores on the playing field at Greenfield Primary, Oldham, Easter holiday. Designed platform, CAT, rig exclusion, fusion joints, glycol charge with spill kit, indoor unit isolated, field closed to the public, mud on Station Road swept daily.

Activities identified

  • General site work
  • Manual handling
  • Power tools
  • Dust-generating work
  • Occupied premises or public areas

Method (8 steps)

  1. 1.Arrive and sign in. Arrive at Greenfield Primary, Oldham, report to the Greenfield Primary site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
  6. 6.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  7. 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  8. 8.Hand over and sign out. Hand over to the Greenfield Primary site contact, report anything outstanding and sign out.

Main risks (5 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Hand and power tools

Residual Low

Who: Operatives

  • Battery or 110V tools used; no 230V tools on site without RCD protection
  • Tools inspected before use and PAT tested where applicable
  • Guards fitted and used as designed
  • Eye protection and gloves suitable for the task

Noise and hand-arm vibration

Residual Medium

Who: Operatives, people nearby

  • Low-vibration, low-noise tools selected
  • Trigger times limited and rotated between operatives
  • Noisy work scheduled to reduce disruption to occupants
  • Hearing protection worn where noise is high

Dust (including silica)

Residual Medium

Who: Operatives, people nearby

  • Use pre-formed holes, or methods that create less dust
  • On-tool extraction (M- or H-class) or water suppression when cutting or drilling
  • Clean up with an M-class vacuum — no dry sweeping
  • Face-fit tested RPE (FFP3 or equivalent) worn

+ 1 more risks in the full RAMS.

What to get right on this document

It starts in the ground

Services, exclusion, mud.

Glycol is COSHH and pollution

Spill and waste.

ASHP is a different job

Do not copy the outdoor-unit method.

What this document has to cover

This is groundworks plus a refrigeration/hydronic install. An air-source heat-pump RAMS that never mentions a drill rig, loop fusion, or glycol spill will fail the first principal contractor.

A ground source heat pump rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Rig overturn or struck-by during borehole drilling
  • Excavation collapse on slinky trenches
  • Glycol spill to drains and watercourses
  • Electrical isolation of the indoor unit
  • Manual handling of plant and manifolds
  • Noise and mud at an occupied school or home

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm loop design, underground services and a spill route that is not a gully
  • Set rig or trench exclusion; CAT before breaking ground
  • Install loops, fuse or connect as specified; pressure-test
  • Position the indoor unit; isolate electrics; charge glycol with spill kit
  • Commission, label, and dispose of waste glycol as hazardous
  • Reinstate ground; keep the occupier’s access open

Occupancy and other people

Schools and housing plots stay in use. Drill rigs terrify neighbours and children. Write hours, mud on the highway, and that the playing field is closed if that is the array.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Glycol / antifreeze
  • Diesel from the rig
  • Jointing compounds
  • Refrigerant only if the indoor unit contains a charge you must handle

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer ground source heat pump rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Open-loop / aquifer?
Different permits and water-quality risks — do not use this closed-loop RAMS.
Is F-gas involved?
Only if you handle refrigerant in the heat pump; glycol is still COSHH.
Do I need a separate piling RAMS?
Boreholes are not piles, but rig stability still needs a platform.
Playing field contamination?
Surveys first if the site is brownfield.