RAMS by job · UK
Ground-mount solar RAMS
This is a construction site with electrical commissioning at the end. A rooftop PV RAMS that talks about eaves is the wrong document.
Typical scope
- Plant-pedestrian segregation
- DC isolation
- Module handling
- Cable trenches
- Perimeter fence
- Commissioning
Quick answer
A ground-mount solar RAMS covers piling or ballasted frames, module handling, DC isolation and construction-site plant on fields or brownfield land. Plant, lifting and DC are the core.
Primary topic: ground mount solar rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Rooftop RAMS reused
No plant or trench.
Strings live while people still laying
DC not controlled.
Open gate
Public on site.
Example
2 MW field array
Built from one job description. You review and adjust every item before issuing it.
Job description
Install ground-mount PV on Parcel B, Fen Solar, Cambridgeshire. Plant routes, module stillages, DC stringing after frames, trench team segregated, perimeter fence before commissioning.
Activities identified
- General site work
- Manual handling
- Excavation
- Solar PV and batteries
Method (12 steps)
- 1.Arrive and sign in. Arrive at Parcel B, Fen Solar, Cambridgeshire, report to the Fen Solar Ltd site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 6.Install mounting system and modules. Fix the mounting system to the roof structure, then install modules. Keep DC isolators open.
- 7.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 8.Connect inverter and DC strings. Install the inverter and AC connection, then connect DC strings last with isolators open.
- 9.Test and commission. Test and commission the installation. Record results.
- 10.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 11.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 12.Hand over and sign out. Hand over to the Fen Solar Ltd site contact, report anything outstanding and sign out.
Main risks (4 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
DC electric shock and arc (solar PV / batteries)
Residual HighWho: Installers
- DC strings connected last; isolators open during installation
- Never make or break DC connectors under load
- Modules covered where practical when working on DC wiring
- Installers competent in PV/battery installation (e.g. MCS-aligned training)
- Insulated tools and gloves
What to get right on this document
It is a construction site
Segregation and welfare.
DC is live energy
When strings become live, write it.
The fence is a control
When it goes up in the sequence.
What this document has to cover
This is a construction site with electrical commissioning at the end. A rooftop PV RAMS that talks about eaves is the wrong document.
A ground mount solar rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Plant versus people on uneven ground
- Manual handling of modules
- DC shock during stringing
- Excavation for cables
- Public or livestock at the fence line
- Weather — wind on large modules
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Set the site: welfare, exclusion, plant routes
- Install frames to design
- Module lift and string with DC isolation discipline
- Trench, cable, backfill
- Inverter commission, fence and signage
- Demobilise waste and compound
Occupancy and other people
Fields attract walkers and livestock. Fencing and gates are a RAMS control, not just a programme item.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Diesel
- Module films/adhesives
- Dust from trenching
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer ground mount solar rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeSolar PV RAMSCreate solar pv rams online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsSolar PV method statementWrite a solar panel method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Do I need a separate trench RAMS?
- You can combine if excavation controls are full; otherwise attach it.
- Wind abort?
- Yes for module handling — write it.
- Brownfield contamination?
- Surveys first; the RAMS should not start blind.
- Grid connection later?
- Still isolate and label unfinished DC.