Grease separator RAMS

You are on a sewage-adjacent appliance full of rotting fat. A drainage RAMS that never mentions biohazard, the kitchen still trading or the lift of a concrete interceptor will fail the chef and the water company.

Typical scope

  • Kitchen closedown
  • Licensed empty before lift
  • Hygiene station
  • Water test of connections
  • Floor / chamber reinstated
  • Emptying schedule at handover

Quick answer

A grease-separator RAMS covers installing or replacing an internal or external grease trap on a catering drainage system. Manual handling of a fouled unit, hygiene, and not flooding a kitchen are the critical harms.

Primary topic: grease separator rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Drainage-trench RAMS reused

    No biohazard, no kitchen.

  • Lifted a full trap

    Spill across the pass.

  • Opened at 11:40 service

    No closedown.

Example

Internal trap swap in a trading brasserie

Built from one job description. You review and adjust every item before issuing it.

Job description

Replace the under-sink grease separator at Queen Street Kitchen, Glasgow. Tuesday 07:00–11:00, kitchen closed, licensed pump-out first, hygiene station, water test, floor made good, chef briefed on the new empty interval.

Activities identified

  • General site work
  • Manual handling

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Queen Street Kitchen, Glasgow, report to the Queen Street Kitchen site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  4. 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the Queen Street Kitchen site contact, report anything outstanding and sign out.

Main risks (1 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

Empty first

A full trap is not a lift.

Hygiene is the method

Not just muddy boots.

Service waits

Closedown hours written.

What this document has to cover

You are on a sewage-adjacent appliance full of rotting fat. A drainage RAMS that never mentions biohazard, the kitchen still trading or the lift of a concrete interceptor will fail the chef and the water company.

A grease separator rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Contact with sewage and rancid grease (biohazard)
  • Dropped or swung unit in a tight kitchen
  • Flooding the kitchen when you break into the drain
  • Confined access in an external chamber
  • Slips on grease on the kitchen floor
  • Staff walking through the open drain at service

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree a kitchen closedown and a bypass or holding plan so you do not flood the pass
  • Hygiene: gloves, visor, no eating, wash station
  • Isolate the inlet; empty the old unit to a licensed route before you lift it
  • Set the new unit to fall; connect; water-test
  • Reinstate floor or chamber; degrease the work area
  • Hand over emptying frequency and the waste contractor

Occupancy and other people

Kitchens want to plate at 12:00. Write the closed hours and that you do not open a trap on a wet service floor with waiters circling.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Grease and food waste (biological)
  • Degreasers
  • Concrete dust if breaking a floor

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer grease separator rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

External interceptor instead?
Add excavation, chamber gases and traffic — do not copy the under-sink method.
Is this the same as an interceptor empty?
Emptying is a maintenance visit; this is a swap. Use the emptying RAMS for PPM.
Do I need inoculations?
Follow your occupational health system; do not pretend fat is clean.
Can the pot-wash stay?
Not while the drain is open.