RAMS by job · UK
Curtain walling glass install RAMS
Install glass units with lifters, wind stop-rules and exclusion below.
Typical scope
- Site and client named
- Critical isolations/access first
- People at risk identified
- Emergency arrangements
- Permit interfaces
- Clean handover
Install glass units with lifters, wind stop-rules and exclusion below. Change the access, occupancy and services and the controls should change with them.
Quick answer
A curtain walling installation rams is a site-specific risk assessment and method statement for that task. It should name the site, the people at risk, the critical controls (often isolation, access or segregation), and the order of work — not a generic trade paragraph.
Primary topic: curtain walling installation rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Copied from last site
Client and site names, access routes and permits still describe the previous job.
Sequence wrong
Critical controls happen after the risk is already present.
Interfaces missing
Other trades, the public or building users are not briefed in the method.
Example
Curtain walling installation on a live site
Built from one job description. You review and adjust every item before issuing it.
Job description
Install glass units with lifters, wind stop-rules and exclusion below. Include access equipment, who else is on site, and how you leave the area safe at the end of the shift.
Activities identified
- General site work
- Manual handling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Example UK site, report to the Example client Ltd site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Example client Ltd site contact, report anything outstanding and sign out.
Main risks (1 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
Make the critical control obvious
If isolation, service location or edge protection is the difference between safe and unsafe, put it early in the method.
Write the occupancy
Occupied homes, retail, healthcare and warehouses each need different public-interface controls.
Close the job out
Testing, reinstatement, waste and handover belong in the document, not in someone's head.
Quick answer
A curtain walling installation rams is a site-specific risk assessment and method statement for that task. It should name the site, the people at risk, the critical controls (often isolation, access or segregation), and the order of work — not a generic trade paragraph.
What good looks like on a UK site
Install glass units with lifters, wind stop-rules and exclusion below. Change the access, occupancy and services and the controls should change with them. Name the site, the people at risk, and the sequence that keeps them safe. Generic paragraphs that could apply anywhere are the first thing a principal contractor rejects.
How SafeForJob helps
- Describe the job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer curtain walling installation rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFit-out RAMSCreate a fit-out or shopfitting RAMS online: partitions, ceilings, dust, occupied premises and out-of-hours work. Reviewed by you before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsConstruction method statementWrite a construction method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- What should a curtain walling installation rams include?
- Job description, site, hazards and who is affected, controls, step-by-step method, and emergency arrangements — specific to this location.
- Can I reuse last month's RAMS?
- Reuse the structure, but update site names, access, occupancy and anything that would look stale to a client.
- Is this legally approved?
- No. It is a drafting aid. You review and issue the document under your competence and contract duties.