Gabion wall RAMS
Gabions are a gravity structure, not landscaping mesh. A retaining-wall RAMS for masonry that never mentions basket handling, rock falls or how you keep a footpath at the toe clear will fail.
Typical scope
- Foundation as designed
- Toe exclusion
- Lace before the next lift
- Machine or chute for rock
- Drainage as drawn
- No unstable overnight lift
Quick answer
A gabion-wall RAMS covers founding and stacking rock-filled baskets on a named slope or boundary. Collapse of a partly built wall, lifting rock, and the public at the toe are the critical harms.
Primary topic: gabion wall rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Landscape RAMS reused
No foundation, no lace.
Rock thrown from the top
Public at the toe.
Three empty baskets stacked for speed
Collapse.
Example
Gabions on a park slope
Built from one job description. You review and adjust every item before issuing it.
Job description
Build a 1.5 m gabion wall on the south slope at Heaton Park, Newcastle. Foundation as drawn, path closed, lace each lift, rock by chute not throw, drainage pipe as specified, no unlaced overnight lift, rangers briefed.
Activities identified
- General site work
- Excavation
Method (7 steps)
- 1.Arrive and sign in. Arrive at Heaton Park, Newcastle, report to the City Parks site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 5.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the City Parks site contact, report anything outstanding and sign out.
Main risks (2 in total)
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
What to get right on this document
It is a structure
Foundation and lace.
Fill from a chute
Do not throw.
The toe is public
Close the path.
What this document has to cover
Gabions are a gravity structure, not landscaping mesh. A retaining-wall RAMS for masonry that never mentions basket handling, rock falls or how you keep a footpath at the toe clear will fail.
A gabion wall rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Collapse of an unfilled or unlaced lift
- Rock falling from a basket onto the toe
- Manual handling and crushed hands on mesh and stone
- Excavation for the foundation striking services
- Plant reversing on a slope
- Public walking the toe path during filling
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the foundation design, drainage and a toe exclusion before a basket is opened
- CAT the foundation; excavate and place the base as designed
- Set empty baskets, lace as specified, fill in layers — no unlaced towers
- Place rock with a machine or chute, not by throwing from the top
- Backfill and drainage as drawn
- Do not leave an unstable lift overnight next to a path
Occupancy and other people
Park paths and gardens stay used. Write the closed path and that a thrown stone is a RAMS failure, not a filling method.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Rock dust
- Diesel from plant
- Geotextile
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer gabion wall rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a masonry retaining wall?
- Different structure. Use the retaining-wall RAMS for brick or concrete.
- Who designs the wall?
- The designer — do not add a lift because you have mesh left.
- Can I fill with site arisings?
- Only if specified — dirty fill fails drainage.
- Temporary fence?
- Yes if the path cannot close — write it.