Gabion wall RAMS

Gabions are a gravity structure, not landscaping mesh. A retaining-wall RAMS for masonry that never mentions basket handling, rock falls or how you keep a footpath at the toe clear will fail.

Typical scope

  • Foundation as designed
  • Toe exclusion
  • Lace before the next lift
  • Machine or chute for rock
  • Drainage as drawn
  • No unstable overnight lift

Quick answer

A gabion-wall RAMS covers founding and stacking rock-filled baskets on a named slope or boundary. Collapse of a partly built wall, lifting rock, and the public at the toe are the critical harms.

Primary topic: gabion wall rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Landscape RAMS reused

    No foundation, no lace.

  • Rock thrown from the top

    Public at the toe.

  • Three empty baskets stacked for speed

    Collapse.

Example

Gabions on a park slope

Built from one job description. You review and adjust every item before issuing it.

Job description

Build a 1.5 m gabion wall on the south slope at Heaton Park, Newcastle. Foundation as drawn, path closed, lace each lift, rock by chute not throw, drainage pipe as specified, no unlaced overnight lift, rangers briefed.

Activities identified

  • General site work
  • Excavation

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Heaton Park, Newcastle, report to the City Parks site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
  4. 4.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
  5. 5.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the City Parks site contact, report anything outstanding and sign out.

Main risks (2 in total)

Excavation collapse and falls into excavations

Residual Medium

Who: Operatives, public

  • Excavations battered back or supported (trench boxes/shoring) where people enter
  • Spoil and plant kept away from the edge
  • Edge protection and barriers around open excavations
  • Excavations inspected at the start of each shift by a competent person

Striking buried services

Residual Medium

Who: Operatives, public

  • Service drawings obtained before digging
  • Area scanned with a CAT and Genny by a trained operator; services marked
  • Trial holes dug by hand near located services (safe digging practice)

What to get right on this document

It is a structure

Foundation and lace.

Fill from a chute

Do not throw.

The toe is public

Close the path.

What this document has to cover

Gabions are a gravity structure, not landscaping mesh. A retaining-wall RAMS for masonry that never mentions basket handling, rock falls or how you keep a footpath at the toe clear will fail.

A gabion wall rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Collapse of an unfilled or unlaced lift
  • Rock falling from a basket onto the toe
  • Manual handling and crushed hands on mesh and stone
  • Excavation for the foundation striking services
  • Plant reversing on a slope
  • Public walking the toe path during filling

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm the foundation design, drainage and a toe exclusion before a basket is opened
  • CAT the foundation; excavate and place the base as designed
  • Set empty baskets, lace as specified, fill in layers — no unlaced towers
  • Place rock with a machine or chute, not by throwing from the top
  • Backfill and drainage as drawn
  • Do not leave an unstable lift overnight next to a path

Occupancy and other people

Park paths and gardens stay used. Write the closed path and that a thrown stone is a RAMS failure, not a filling method.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Rock dust
  • Diesel from plant
  • Geotextile

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer gabion wall rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this a masonry retaining wall?
Different structure. Use the retaining-wall RAMS for brick or concrete.
Who designs the wall?
The designer — do not add a lift because you have mesh left.
Can I fill with site arisings?
Only if specified — dirty fill fails drainage.
Temporary fence?
Yes if the path cannot close — write it.