Foundations RAMS
Excavate and cast foundations with services, collapse and concrete COSHH controls.
Typical scope
- Site and client named
- Critical isolations/access first
- People at risk identified
- Emergency arrangements
- Permit interfaces
- Clean handover
Excavate and cast foundations with services, collapse and concrete COSHH controls. Change the access, occupancy and services and the controls should change with them.
Quick answer
A foundations method statement is a site-specific risk assessment and method statement for that task. It should name the site, the people at risk, the critical controls (often isolation, access or segregation), and the order of work — not a generic trade paragraph.
Primary topic: foundations method statement. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Copied from last site
Client and site names, access routes and permits still describe the previous job.
Sequence wrong
Critical controls happen after the risk is already present.
Interfaces missing
Other trades, the public or building users are not briefed in the method.
Example
Foundations and footings on a live site
Built from one job description. You review and adjust every item before issuing it.
Job description
Excavate and cast foundations with services, collapse and concrete COSHH controls. Include access equipment, who else is on site, and how you leave the area safe at the end of the shift.
Activities identified
- General site work
- Dust-generating work
- Excavation
Method (7 steps)
- 1.Arrive and sign in. Arrive at Example UK site, report to the Example client Ltd site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Locate buried services. Review service drawings and scan the area with a CAT and Genny. Mark located services before breaking ground.
- 4.Excavate. Excavate by hand near located services, then by machine. Support or batter back excavations and keep spoil away from the edge.
- 5.Backfill and reinstate. Backfill in layers, compact, and reinstate the surface. Remove barriers once the area is safe.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Example client Ltd site contact, report anything outstanding and sign out.
Main risks (3 in total)
Dust (including silica)
Residual MediumWho: Operatives, people nearby
- Use pre-formed holes, or methods that create less dust
- On-tool extraction (M- or H-class) or water suppression when cutting or drilling
- Clean up with an M-class vacuum — no dry sweeping
- Face-fit tested RPE (FFP3 or equivalent) worn
Excavation collapse and falls into excavations
Residual MediumWho: Operatives, public
- Excavations battered back or supported (trench boxes/shoring) where people enter
- Spoil and plant kept away from the edge
- Edge protection and barriers around open excavations
- Excavations inspected at the start of each shift by a competent person
Striking buried services
Residual MediumWho: Operatives, public
- Service drawings obtained before digging
- Area scanned with a CAT and Genny by a trained operator; services marked
- Trial holes dug by hand near located services (safe digging practice)
What to get right on this document
Make the critical control obvious
If isolation, service location or edge protection is the difference between safe and unsafe, put it early in the method.
Write the occupancy
Occupied homes, retail, healthcare and warehouses each need different public-interface controls.
Close the job out
Testing, reinstatement, waste and handover belong in the document, not in someone's head.
Quick answer
A foundations method statement is a site-specific risk assessment and method statement for that task. It should name the site, the people at risk, the critical controls (often isolation, access or segregation), and the order of work — not a generic trade paragraph.
What good looks like on a UK site
Excavate and cast foundations with services, collapse and concrete COSHH controls. Change the access, occupancy and services and the controls should change with them. Name the site, the people at risk, and the sequence that keeps them safe. Generic paragraphs that could apply anywhere are the first thing a principal contractor rejects.
How SafeForJob helps
- Describe the job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer foundations method statement document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsConstruction method statementWrite a construction method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- What should a foundations method statement include?
- Job description, site, hazards and who is affected, controls, step-by-step method, and emergency arrangements — specific to this location.
- Can I reuse last month's RAMS?
- Reuse the structure, but update site names, access, occupancy and anything that would look stale to a client.
- Is this legally approved?
- No. It is a drafting aid. You review and issue the document under your competence and contract duties.