Fire-door survey RAMS
This is not a fire door RAMS. This job covers surveying fire doors in an occupied building, and the control that keeps people safe is a brief that no fire door is wedged and that the survey is not a repair. If the RAMS never names which doors stay on hold-open, escape and the occupier, a principal contractor will send it back.
Typical scope
- A brief that no fire door is wedged and that the survey is not a repair as a hold point
- Which doors stay on hold-open, escape and the occupier named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A fire-door survey rams covers surveying fire doors in an occupied building on a named UK site. The critical control is a brief that no fire door is wedged and that the survey is not a repair. Write which doors stay on hold-open, escape and the occupier into the sequence — a pack that could describe any fire door RAMS will not survive a competent review.
Primary topic: fire-door survey rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
fire door RAMS reused
Missing: a brief that no fire door is wedged and that the survey is not a repair.
Critical control buried
Which doors stay on hold-open, escape and the occupier belongs in the sequence.
Occupancy ignored
Which doors stay on hold-open, escape and the occupier and that someone who did not read the pack will walk the exclusion.
Example
Fire-door survey on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Surveying fire doors in an occupied building at Spinning floor, Keighley Mills, Keighley. Holiday week, staff return Friday. A brief that no fire door is wedged and that the survey is not a repair; which doors stay on hold-open, escape and the occupier; which doors stay on hold-open, escape and the occupier and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Occupied premises or public areas
Method (5 steps)
- 1.Arrive and sign in. Arrive at Spinning floor, Keighley Mills, Keighley, report to the Keighley Mills FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Keighley Mills FM site contact, report anything outstanding and sign out.
Main risks (1 in total)
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
What to get right on this document
Critical control first
Write a brief that no fire door is wedged and that the survey is not a repair before the work step.
Name the site facts
Which doors stay on hold-open, escape and the occupier
People who did not read the pack
The named site stays in use around this fire-door survey job
What this document has to cover
This is not a fire door RAMS. This job covers surveying fire doors in an occupied building, and the control that keeps people safe is a brief that no fire door is wedged and that the survey is not a repair. If the RAMS never names which doors stay on hold-open, escape and the occupier, a principal contractor will send it back.
A fire-door survey rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if a brief that no fire door is wedged and that the survey is not a repair is skipped on this fire-door survey job
- Fire-door survey left open so a passer-by reaches the hazard
- Wrong isolation so a sister fire-door survey stays live
- Manual handling or dropped parts on this fire-door survey job
- Weather, dust or a substance unique to surveying fire doors in an occupied building
- The next crew inheriting an open fire-door survey hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: a brief that no fire door is wedged and that the survey is not a repair
- Brief the dutyholder on which doors stay on hold-open, escape and the occupier
- Set an exclusion that matches fire door RAMS failing on this site
- Do the work to the sequence that keeps a brief that no fire door is wedged and that the survey is not a repair first
- Test or prove the critical control still holds
- Handover residual fire-door survey hazards in writing
Occupancy and other people
The named site stays in use around this fire-door survey job. Write which doors stay on hold-open, escape and the occupier and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while surveying fire doors in an occupied building
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer fire-door survey rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFire & security RAMSCreate RAMS for fire alarm, CCTV and access control installation: system isolations, ceiling work, occupied buildings. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a fire door RAMS?
- No. A fire-door survey RAMS has to name which doors stay on hold-open, escape and the occupier. A fire door RAMS will not survive a competent review.
- Can we skip a brief that no fire door is wedged and that the survey is not a repair?
- No. A brief that no fire door is wedged and that the survey is not a repair is the hold point. Write it before the work step.
- Who writes which doors stay on hold-open, escape and the occupier?
- The competent person who issues this fire-door survey rams. A sticky note is not a handover.
- Can AI issue this fire-door survey rams?
- A tool can draft a fire-door survey pack. A competent person reviews and issues it for this site.