Skip to content
SafeForJob

RAMS by job · UK

Fire door installation RAMS

A joinery RAMS that never mentions certification, smoke seals or an escape route being blocked by a door on acrow props is not a fire-door RAMS.

Typical scope

  • Certified detail
  • Phased escape
  • Seal specification
  • Handling plan
  • Inspection record
  • No overnight obstruction

Quick answer

A fire door installation RAMS covers fitting certified doorsets in occupied buildings. The fire strategy, hanging, intumescent seals and keeping escape routes usable are the point of the document.

Primary topic: fire door installation rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Joinery RAMS reused

    No seals or strategy.

  • Three doors off one corridor

    Escape blocked.

  • Uncertified ironmongery

    Detail lost.

Example

Stair fire doors in a hall of residence

Built from one job description. You review and adjust every item before issuing it.

Job description

Replace six stair fire doors at Castle Court, Durham University. One leaf at a time, alternative stair kept live, certified doorsets, intumescent as the schedule, students in occupation.

Activities identified

  • General site work
  • Manual handling

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Castle Court, Durham, report to the University Estates site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  4. 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the University Estates site contact, report anything outstanding and sign out.

Main risks (1 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

Strategy first

Which doors can be off at once.

Certification is the method

The tested detail, not ‘close enough’.

Corridor is an escape route

Store doors elsewhere.

What this document has to cover

A joinery RAMS that never mentions certification, smoke seals or an escape route being blocked by a door on acrow props is not a fire-door RAMS.

A fire door installation rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Blocking an escape route during hanging
  • Manual handling of heavy doorsets
  • Dust from hanging and intumescent fitting
  • Work in live corridors
  • Incorrect certification / unapproved gaps
  • Tools and doors stored in stairs

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Confirm the fire strategy and which leaf can be out at once
  • Keep an alternative escape route available
  • Install frames, hang, seal and ironmongery to the certified detail
  • Do not leave doors unhung in the corridor overnight
  • Inspect gaps, seals and closer action
  • Handover certificates and remaining snags

Occupancy and other people

Hospitals and halls of residence need a route at all times. Phasing is a fire control, not just a programme note.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Intumescent mastics
  • Paints if making good
  • Dust from planing

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer fire door installation rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is a RAMS required?
Clients and principal contractors almost always want one for fire doors in occupied buildings.
Can I plane a certified door?
Only as the certified detail allows — write that limit.
Smoke seals later?
No. They are part of the install step.
What about glazing in the door?
Glass handling and fire-rated units belong in the method.