Fire curtain RAMS

A fire curtain is life-safety machinery, not a blind. A roller-shutter RAMS that never mentions the fire-alarm interface, descent on power-fail or how you keep people out of the closing line will fail the fire engineer.

Typical scope

  • Strategy during the outage
  • Barrel lift plan
  • Alarm interface as specified
  • Hard exclusion on descent test
  • Witnessed drop
  • Handover of the test regime

Quick answer

A fire-curtain RAMS covers installing a powered fire-resisting curtain over a named opening. The lift of the barrel, gravity-fail testing and the public still using the opening are the critical harms.

Primary topic: fire curtain rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Shop shutter RAMS reused

    No fire interface.

  • Descent test at lunch in the atrium

    People in the line.

  • Left up overnight because ‘it looks nicer’

    Strategy broken.

Example

Atrium curtain in a live civic foyer

Built from one job description. You review and adjust every item before issuing it.

Job description

Install a fire curtain over the atrium at Civic House, York. Sunday, foyer alternative route signed, barrel lift from a scissor, alarm interface as drawn, descent test with a hard exclusion, estates witness, no leave-up overnight.

Activities identified

  • General site work
  • Manual handling

Method (6 steps)

  1. 1.Arrive and sign in. Arrive at Atrium, Civic House, York, report to the Civic House FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  4. 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  5. 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  6. 6.Hand over and sign out. Hand over to the Civic House FM site contact, report anything outstanding and sign out.

Main risks (1 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

The interface is the job

Alarm and fail-safe.

Nobody in the line

Marshal the test.

The strategy owns overnight

Do not leave it up as a convenience.

What this document has to cover

A fire curtain is life-safety machinery, not a blind. A roller-shutter RAMS that never mentions the fire-alarm interface, descent on power-fail or how you keep people out of the closing line will fail the fire engineer.

A fire curtain rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Dropped barrel during the lift
  • Crushing on a descent test
  • Electric shock on motors and controls
  • Opening left without its fire barrier overnight
  • Public walking under a curtain in learn mode
  • Wrong interface so it does not drop on alarm

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree whether the opening stays in use and how the fire strategy is held during the works
  • Isolate; lift and fix the barrel with a planned lift
  • Fit guides, overrides and the alarm interface as specified
  • Do not descent-test with people in the line — marshal a hard exclusion
  • Witness drop and reset with the responsible person
  • Hand over isolation, test regime and remaining defects

Occupancy and other people

Atria and shop openings stay busy. Write the marshal and that a curtain left up overnight against the strategy is a RAMS failure.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Grease
  • Cleaning solvents on the fabric
  • Paints on making-good

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer fire curtain rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this a roller shutter?
Related barrel lift, different fire interface and fabric. Use this RAMS.
Smoke curtain vs fire curtain?
Write the specified rating — they are not interchangeable.
Who witnesses the drop?
Estates or the fire engineer named on the permit — they sign the drop, not the installer alone.
Can AI issue the witness sheet?
A person signs the witness. A tool only drafts the RAMS.