RAMS by job · UK
Earthing upgrade RAMS
This is not a socket test. You are digging, exothermic-welding or clamping to structure, and leaving the building’s earth as you found it or better. An EICR RAMS never mentions the pit or the storm abort.
Typical scope
- Service location for pits
- Storm abort
- Hot-works control if welding
- Bonds only at designed points
- Test values recorded
- Pit covered when unattended
Quick answer
An earthing-upgrade RAMS covers installing or replacing earth electrodes, tapes and bonds on a named building. Excavation for pits, bonding to live services, and test values that must be recorded are the core.
Primary topic: earthing upgrade rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
EICR RAMS reused
No pit, no electrode.
Clamp on the gas service as a shortcut
Wrong bond point.
Pit left open on the pavement
A trip into a live excavation.
Example
Additional rods at a village hall
Built from one job description. You review and adjust every item before issuing it.
Job description
Drive two additional earth rods at Langley Village Hall, Macclesfield. CAT, pavement exclusion at the side gate, no work in a thunderstorm, bonds to the specified bar only, values recorded before backfill, pit lids locked.
Activities identified
- General site work
Method (4 steps)
- 1.Arrive and sign in. Arrive at Langley Village Hall, Macclesfield, report to the Langley Parish Council site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 4.Hand over and sign out. Hand over to the Langley Parish Council site contact, report anything outstanding and sign out.
Main risks (0 in total)
What to get right on this document
The design names the electrodes
Do not add a rod because the reading ‘felt high’.
Pits are excavations
CAT and cover.
Values go on a certificate
Not a thumbs-up.
What this document has to cover
This is not a socket test. You are digging, exothermic-welding or clamping to structure, and leaving the building’s earth as you found it or better. An EICR RAMS never mentions the pit or the storm abort.
An earthing upgrade rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Electric shock when bonding to existing incoming services
- Excavation striking buried services at the electrode
- Hot works or exothermic weld at the pit
- Falls into an open earth pit
- Public at a pavement electrode
- Weather — do not be the earth path in a thunderstorm
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the design, incoming service drawings and a storm abort
- CAT and permit before the first pit; set exclusion at the pavement
- Drive or bury electrodes; control hot works if used
- Bond tapes to the specified points; do not improvise a clamp on a gas meter
- Test and record values before backfill
- Reinstate and leave the inspection pit accessible
Occupancy and other people
High-street buildings have people walking the electrode line. Write the footway management and that you do not leave an open pit over lunch.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Exothermic welding powders if used
- Bitumen or sealants at building entries
- Bentonite or earth-enhancement compound if specified
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer earthing upgrade rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeElectrical RAMSCreate a site-specific electrical RAMS online. Describe the job, review suggested risks like safe isolation and work at height, and download a professional PDF.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsMethod statement for electrical worksWrite a method statement for electrical works for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this lightning protection?
- Related earth, different air terminals and down conductors — use that RAMS if you are on the roof.
- Can I test in the rain?
- Moisture changes readings; follow the specification, and abort in a storm.
- SDS for bentonite?
- SDS is not a COSHH assessment — write the task, quantity and who is exposed.
- Who owns the incoming earth?
- The network operator or landlord — do not cut their conductor.