RAMS by job · UK
Duct bank RAMS
A duct bank is a designed service corridor, not a single drainage trench. A drainage-trench RAMS that never mentions spacing of ways, concrete surround or how you stop someone pulling into a live HV duct will fail the asset owner.
Typical scope
- Design and way occupancy
- TM and CAT
- Specified spacing
- Ways capped
- Washout bay
- Trench plated when unattended
Quick answer
A duct-bank RAMS covers excavating and laying a multi-way duct run, often in concrete, for HV, LV or fibre on a named route. Collapse, live services already in the ground, and the public at a street works are the core.
Primary topic: duct bank rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Drainage RAMS reused
No way occupancy, no HV.
Fibre pulled into an HV way
Wrong occupancy.
Trench left open over a weekend
Public.
Example
HV/LV duct bank under a footway
Built from one job description. You review and adjust every item before issuing it.
Job description
Lay a six-way duct bank on Station Approach, Derby. NRSWA, trial holes at the gas mark, shoring, specified spacing, concrete surround, ways capped, HV and fibre in separate banks as drawn, plated overnight, walkway boarded.
Activities identified
- General site work
- Dust-generating work
- Fibre and data cabling
Method (6 steps)
- 1.Arrive and sign in. Arrive at Station Approach, Derby, report to the County Highways site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Install and splice fibre. Route and secure cables, then cleave and splice fibres. Dispose of offcuts in the sharps container.
- 4.Test and commission. Test and commission the installation. Record results.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the County Highways site contact, report anything outstanding and sign out.
Main risks (2 in total)
Dust (including silica)
Residual MediumWho: Operatives, people nearby
- Use pre-formed holes, or methods that create less dust
- On-tool extraction (M- or H-class) or water suppression when cutting or drilling
- Clean up with an M-class vacuum — no dry sweeping
- Face-fit tested RPE (FFP3 or equivalent) worn
Optical fibre — laser light and glass shards
Residual LowWho: Engineers
- Never look into fibre ends or connectors; treat all fibres as live
- Fibre offcuts placed in a dedicated sharps container
- Safety glasses worn when cleaving and splicing
What to get right on this document
Ways are designed
Do not mix HV and comms.
CAT and trials at conflicts
Do not machine blind.
Cap every way
A control, not a snag.
What this document has to cover
A duct bank is a designed service corridor, not a single drainage trench. A drainage-trench RAMS that never mentions spacing of ways, concrete surround or how you stop someone pulling into a live HV duct will fail the asset owner.
A duct bank rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Excavation collapse on a deep bank
- Strike of existing live HV, gas or fibre
- Public at an open trench
- Wet-concrete burns on a surround
- Wrong occupancy of a way so HV and comms share a duct they must not
- Plant reversing along a live footway
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Confirm the design, way occupancy and service drawings before breaking ground
- Set TM; CAT and trial holes at conflicts
- Shore; lay ducts to the specified spacing and bends — no kinks to ‘save a pit’
- Surround as specified; wash out only in the bay
- Draw cords in; cap ways; do not leave an open duct into a live chamber
- Backfill, plate, reinstate
Occupancy and other people
High streets stay open. Write the walkway and that an open HV way is not a handy slot for a fibre crew.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Wet concrete if surrounded
- Diesel from plant
- Duct lubricant if used
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer duct bank rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsExcavation method statementWrite a excavation method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a drainage trench?
- No — this is a service duct bank with way occupancy.
- Directional drill instead?
- A different method — use that RAMS if you are drilling.
- Who owns the ways?
- The asset owner — do not gift a spare to another utility.
- Can I omit the surround?
- Only if the design says so.