Skip to content
SafeForJob

RAMS by job · UK

Drain jetting RAMS

Jetting is a high-pressure tool in a dirty system, not a plunger. A facilities PPM RAMS that never mentions hose whip, nozzle reaction or how you warn the floor above will fail.

Typical scope

  • Occupants on the line told
  • Two-person hose
  • No unplanned chamber entry
  • Arisings as waste
  • Covers locked
  • WCs signed back in

Quick answer

A drain-jetting RAMS covers high-pressure water jetting of drains on a named site. Hose whip, sewage hygiene, and not blowing a toilet in an occupied room are the critical harms.

Primary topic: drain jetting rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • PPM RAMS reused

    No whip, no blow-back.

  • One person on a 4000 psi hose

    Whip.

  • Kitchen left open on the same stack

    Blow-back.

Example

Stack jetting under a live kitchen

Built from one job description. You review and adjust every item before issuing it.

Job description

Jet the kitchen stack at Queen Street Kitchen, Glasgow, Monday 06:00–08:00. Kitchen closed, two-person hose, no chamber entry, arisings to a sealed drum, covers locked, chef told before service.

Activities identified

  • General site work
  • Confined space

Method (5 steps)

  1. 1.Arrive and sign in. Arrive at Queen Street Kitchen, Glasgow, report to the Queen Street Kitchen site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Confined space permit and gas test. Obtain the permit to work, test the atmosphere and confirm rescue arrangements before anyone enters.
  4. 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  5. 5.Hand over and sign out. Hand over to the Queen Street Kitchen site contact, report anything outstanding and sign out.

Main risks (1 in total)

Confined space

Residual Medium

Who: Operatives, rescuers

  • Avoid entry — do the work from outside where possible
  • Permit to work and confined space trained operatives
  • Atmosphere tested before and during entry with a calibrated gas monitor
  • Emergency rescue arrangements in place before entry

What to get right on this document

The hose needs two people

Reaction is the harm.

Warn the stack

WCs out.

Chambers are confined spaces

Do not drop in.

What this document has to cover

Jetting is a high-pressure tool in a dirty system, not a plunger. A facilities PPM RAMS that never mentions hose whip, nozzle reaction or how you warn the floor above will fail.

A drain jetting rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Hose whip or nozzle striking the operator
  • Contact with sewage
  • Water and sewage blowing back into an occupied WC or kitchen
  • Confined-space gases if you enter a chamber
  • Slips on a wet yard
  • Public at an open cover on a pavement

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Survey the run; tell occupants on the line that WCs are out
  • Set exclusion at the cover; hygiene station
  • Jet from the designed access; two-person on the hose
  • Do not enter a chamber unless a confined-space plan is in force
  • Contain arisings; licensed waste, not a gully
  • Leave covers locked; tell occupants they can use the WCs

Occupancy and other people

Offices will sit down at 10:00. Write the out-of-use signs and that a blow-back into a basement kitchen is a RAMS failure.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Sewage (biological)
  • Jetting water once dirty
  • Diesel from a trailer unit

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer drain jetting rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as interceptor emptying?
No — jetting is a pressure tool; emptying is a sucker.
Do I need confined-space?
If anyone’s breathing zone enters a chamber, yes.
What pressure?
Write the actual unit — 2000 and 4000 psi are different reactions.
Who tells the floor above?
You, before the hose goes in.