RAMS by job · UK
Disabled refuge alarm RAMS
A refuge EVC is life-safety communications, not a door-entry phone. A fire-alarm RAMS that never mentions the refuge sign, the stair in use or how you keep a live system while you swap a handset will fail the access officer.
Typical scope
- Offline compensation
- Escape width kept
- Specified height and location
- Speech test
- Signs fitted
- No overnight dead refuge in occupation
Quick answer
A disabled-refuge RAMS covers installing or testing emergency voice communication at named refuge points. Stair occupancy, false isolation of a live system and not leaving a refuge without a phone are the core.
Primary topic: disabled refuge alarm rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Door-entry RAMS reused
No refuge, no compensation.
Handset at standing height only
Unreachable.
Landing used as a workshop
Escape blocked.
Example
EVC handsets in an occupied stair
Built from one job description. You review and adjust every item before issuing it.
Job description
Install refuge EVC at landings 2–5, stair A, Harbour Tower, Poole. Stair B as compensation on Saturday, 1000 mm width kept, handsets at specified height, speech test to the desk, signs on, RTM record, no overnight dead point.
Activities identified
- General site work
- Mobile tower or scaffold
- Manual handling
Method (7 steps)
- 1.Arrive and sign in. Arrive at Stair A, Harbour Tower, Poole, report to the Harbour Tower RTM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
- 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 7.Hand over and sign out. Hand over to the Harbour Tower RTM site contact, report anything outstanding and sign out.
Main risks (3 in total)
Fall from tower or scaffold, or collapse
Residual MediumWho: Operatives, people nearby
- Mobile towers erected by PASMA-trained persons to the manufacturer's guide
- Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
- Guard rails, toe boards and brick guards in place on working platforms
- Castors locked and outriggers fitted; never moved while occupied
Falling objects
Residual LowWho: People below, other trades, public
- Exclusion zone set up below the work area with barriers and signage
- Tools tethered when working at height; materials kept away from edges
- Banksman or second person controls the area during lifts and removals
- Hard hats worn in the exclusion zone
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
What to get right on this document
A refuge must work or be compensated
Write which.
Height is specified
Not cable convenience.
The stair stays an escape
Width and no drums.
What this document has to cover
A refuge EVC is life-safety communications, not a door-entry phone. A fire-alarm RAMS that never mentions the refuge sign, the stair in use or how you keep a live system while you swap a handset will fail the access officer.
A disabled refuge alarm rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Refuge left without a working communicator during occupation
- Falls and trips in a stair used as a workplace
- Electric shock on a 24 V or mains-backed panel
- Public or staff using the stair while cable is pulled
- Wrong location so a wheelchair user cannot reach the handset
- Alarm interface missing so the panel is not heard
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree compensation if a refuge will be offline — another refuge or a marshal
- Set a safe working area in the stair that leaves an escape width
- Install to the specified locations and heights; do not ‘put it where the cable reaches’
- Test two-way speech and any fire-panel interface
- Sign the refuge; do not leave a dead handset overnight in an occupied building
- Hand over to the responsible person with a test record
Occupancy and other people
Occupied stairs are escapes. Write the residual width and that a cable drum on a landing is a RAMS failure.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Cable-pull dust
- Cleaning wipes on handsets
- Fixing resin in masonry
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer disabled refuge alarm rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFire & security RAMSCreate RAMS for fire alarm, CCTV and access control installation: system isolations, ceiling work, occupied buildings. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFire alarm installation method statementWrite a fire alarm method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this a fire alarm?
- It is a related life-safety system. This RAMS is the refuge communications.
- Can I use any intercom?
- No — use the specified EVC system.
- Who answers the handset?
- The dutyholder — brief them.
- Is this legal advice on accessibility?
- No. Follow the specified locations.