RAMS by job · UK
Diamond drilling RAMS
Drilling is not ‘making a hole’. Hitting a live service, flooding a floor below, or leaving an unguarded core hole overnight is how these jobs go wrong.
Typical scope
- Service scan and permit
- Catch above and below
- Wet cut as default
- Hole covered same visit
- HAVS time
- Slurry disposal
Quick answer
A diamond drilling RAMS covers core, stitch or track drilling through slabs and walls on a named site. Buried services, silica slurry, water, and the hole you leave behind are the critical controls.
Primary topic: diamond drilling rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
No scan
Bit into a live conduit.
Dry cutting to ‘save the floor’
Silica.
Hole left open
Someone’s foot or a chair leg.
Example
Stitch-drill a slab opening in a live office
Built from one job description. You review and adjust every item before issuing it.
Job description
Stitch-drill a 600 mm opening in the level-3 slab at Apex House, Reading, Saturday. GPR scan, permit, catch on level 2, wet cut, holes capped before Sunday cleaners, slurry to the agreed waste, not the gully.
Activities identified
- General site work
- Power tools
- Dust-generating work
- Using chemicals or products
Method (6 steps)
- 1.Arrive and sign in. Arrive at Level 3, Apex House, Reading, report to the Apex House FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Drill and fix. Mark out, then drill and fix using on-tool dust extraction. Check for hidden cables and pipes before drilling.
- 4.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Apex House FM site contact, report anything outstanding and sign out.
Main risks (4 in total)
Hand and power tools
Residual LowWho: Operatives
- Battery or 110V tools used; no 230V tools on site without RCD protection
- Tools inspected before use and PAT tested where applicable
- Guards fitted and used as designed
- Eye protection and gloves suitable for the task
Noise and hand-arm vibration
Residual MediumWho: Operatives, people nearby
- Low-vibration, low-noise tools selected
- Trigger times limited and rotated between operatives
- Noisy work scheduled to reduce disruption to occupants
- Hearing protection worn where noise is high
Dust (including silica)
Residual MediumWho: Operatives, people nearby
- Use pre-formed holes, or methods that create less dust
- On-tool extraction (M- or H-class) or water suppression when cutting or drilling
- Clean up with an M-class vacuum — no dry sweeping
- Face-fit tested RPE (FFP3 or equivalent) worn
Hazardous substances
Residual MediumWho: Operatives, people nearby
- Use the least hazardous product that does the job
- COSHH assessment in place for each hazardous substance and briefed to operatives
- Good ventilation during and after use
- Substances stored and disposed of as the Safety Data Sheet describes
- Gloves and eye protection as specified on the SDS
What to get right on this document
Scan then drill
Permit on the RAMS.
Catch the floor below
Named, not hoped.
Cover the hole
A control, not a snag.
What this document has to cover
Drilling is not ‘making a hole’. Hitting a live service, flooding a floor below, or leaving an unguarded core hole overnight is how these jobs go wrong.
A diamond drilling rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Contact with buried electrical, gas or water services
- Silica in slurry and dry cutting (if someone ‘just tries it dry’)
- Water damage and slips on the floor below
- Falls through an unguarded core hole
- Manual handling of rigs and cores
- Noise and vibration (HAVS) to the operator
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Scan, drawings and permit before the bit turns — no ‘we’ll see’
- Set catch, exclusion above and below, and a water/slurry control
- Drill wet unless the specification forbids it and a dry-silica plan is in place
- Cap or cover every hole before leaving the bay
- Remove cores the planned route; do not roll them down a stair
- Clean slurry; do not put it in a surface-water drain
Occupancy and other people
Hospitals and live offices have people on the floor below. Tell them, catch the water, and never leave a 200 mm hole in a corridor overnight.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Silica slurry
- Cooling water (not ‘clean’ once it has cut)
- Cutting fluids if used
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer diamond drilling rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsSoft strip method statementWrite a soft strip method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is GPR enough?
- It is an aid. Drawings, a permit and a cautious start still belong in the method.
- Can I core a post-tensioned slab?
- Only with the designer’s go-ahead — tendons are a different risk.
- HAVS?
- Rotate operators and record time; do not pretend the rig is vibration-free.
- What about asbestos in soffits?
- Survey before drilling older buildings.