Cooling tower works RAMS

This is not a dry condenser job. You are in aerosol, chemicals and a live cooling system that can infect people far from the roof if you splash and drift.

Typical scope

  • Written scheme / responsible person
  • Edge protection on the deck
  • Drain route not a gully
  • COSHH for the biocide
  • Restart only to the scheme
  • Fill waste characterised

Quick answer

A cooling-tower RAMS covers maintenance or pack replacement on an evaporative tower: height, water treatment chemicals, Legionella and the lift of fill. The water system and the edge of the deck are the critical interface.

Primary topic: cooling tower rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Condenser RAMS reused

    No aerosol, no biocide.

  • Basin emptied over the parapet

    Drift and pollution.

  • Fan deck left as a hole

    Fall through.

Example

Pack replacement on a hospital tower

Built from one job description. You review and adjust every item before issuing it.

Job description

Replace fill on cooling tower CT-1 at Royal Infirmary plant deck, Coventry. Isolation to the written scheme, deck edge protection, basin to the foul connection, biocide COSHH, fill in sealed bags, intakes on Ward C briefed, no fan-dry.

Activities identified

  • General site work
  • Mobile tower or scaffold
  • Manual handling

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Plant deck, Royal Infirmary, Coventry, report to the Trust Estates site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Erect the tower. PASMA-trained operatives erect the mobile tower to the manufacturer's guide and inspect it before use.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Trust Estates site contact, report anything outstanding and sign out.

Main risks (3 in total)

Fall from tower or scaffold, or collapse

Residual Medium

Who: Operatives, people nearby

  • Mobile towers erected by PASMA-trained persons to the manufacturer's guide
  • Scaffold erected by a competent scaffolder and tagged/inspected before use and every 7 days
  • Guard rails, toe boards and brick guards in place on working platforms
  • Castors locked and outriggers fitted; never moved while occupied

Falling objects

Residual Low

Who: People below, other trades, public

  • Exclusion zone set up below the work area with barriers and signage
  • Tools tethered when working at height; materials kept away from edges
  • Banksman or second person controls the area during lifts and removals
  • Hard hats worn in the exclusion zone

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

What to get right on this document

The scheme owns restart

Not a thumbs-up on the roof.

Aerosol is the harm

Drift, neighbours, intakes.

Chemicals are named

SDS ≠ COSHH — write the task.

What this document has to cover

This is not a dry condenser job. You are in aerosol, chemicals and a live cooling system that can infect people far from the roof if you splash and drift.

A cooling tower rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Legionella and aerosol from the basin and drift
  • Falls from the tower deck or through a removed fan deck
  • Chemical burns from biocides and inhibitors
  • Dropped fill or a fan into the basin or over the edge
  • Confined access inside the tower
  • Building occupants and neighbours downwind of drift

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree isolation, drain-down and a Legionella plan with the responsible person before opening the basin
  • Set edge protection and exclusion under the lift of fill
  • Dose-down and drain to the agreed route — not the roof gully
  • Replace pack or complete the task with COSHH for the actual chemicals
  • Clean, refill, restart only to the written scheme
  • Remove waste fill as the specified waste stream

Occupancy and other people

Hospitals and city roofs have air intakes and openable windows downwind. Write drift direction, who is told, and that you do not run the fans as a dryer.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Biocides and inhibitors (name the actual)
  • Basin sludge (treat as hazardous until characterised)
  • Cleaning acids if used

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer cooling tower rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this Legionella legal advice?
No. Follow the written scheme and competent advice; this RAMS is the task method.
Dry cooler instead?
Different job — no basin aerosol, still height and lift.
Do I enter the tower?
If you do, assess confined space; do not crawl in on this page alone.
Who is the responsible person?
Name them — restart is theirs.