On-site concrete crush RAMS
This is not a diamond drilling RAMS. This job covers crushing concrete on a live site, and the control that keeps people safe is a silica, exclusion and neighbour plan before the crusher starts. If the RAMS never names dust, flying fragments and who walks the yard, a principal contractor will send it back.
Typical scope
- A silica, exclusion and neighbour plan before the crusher starts as a hold point
- Dust, flying fragments and who walks the yard named
- Exclusion that actually holds
- Sequence that cannot skip the critical control
- Handover of residual hazards
- Review before issue — not a stamp
Quick answer
A on-site concrete crush rams covers crushing concrete on a live site on a named UK site. The critical control is a silica, exclusion and neighbour plan before the crusher starts. Write dust, flying fragments and who walks the yard into the sequence — a pack that could describe any diamond drilling RAMS will not survive a competent review.
Primary topic: on-site concrete crush rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
diamond drilling RAMS reused
Missing: a silica, exclusion and neighbour plan before the crusher starts.
Critical control buried
Dust, flying fragments and who walks the yard belongs in the sequence.
Occupancy ignored
Dust, flying fragments and who walks the yard and that someone who did not read the pack will walk the exclusion.
Example
On-site concrete crush on a named site
Built from one job description. You review and adjust every item before issuing it.
Job description
Crushing concrete on a live site at Pier store, Truro Harbour, Truro. Holiday week, staff return Friday. A silica, exclusion and neighbour plan before the crusher starts; dust, flying fragments and who walks the yard; dust, flying fragments and who walks the yard and that someone who did not read the pack will walk the exclusion.
Activities identified
- General site work
- Dust-generating work
- Occupied premises or public areas
- Outdoor or exposed work
Method (5 steps)
- 1.Arrive and sign in. Arrive at Pier store, Truro Harbour, Truro, report to the Truro Harbour FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
- 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 5.Hand over and sign out. Hand over to the Truro Harbour FM site contact, report anything outstanding and sign out.
Main risks (3 in total)
Dust (including silica)
Residual MediumWho: Operatives, people nearby
- Use pre-formed holes, or methods that create less dust
- On-tool extraction (M- or H-class) or water suppression when cutting or drilling
- Clean up with an M-class vacuum — no dry sweeping
- Face-fit tested RPE (FFP3 or equivalent) worn
Members of the public and building occupants
Residual LowWho: Public, customers, staff, residents
- Work area segregated with barriers and clear signage
- Work timed for quieter periods where possible, agreed with the site
- Tools and materials never left unattended in public areas
- Site contact informed of work areas and any disruption
Adverse weather
Residual LowWho: Operatives
- Forecast checked before work; work at height stopped in high winds
- Breaks, water and shade in hot weather; warm clothing in cold
- Sun protection on exposed work in summer
What to get right on this document
Critical control first
Put this hold point first: a silica, exclusion and neighbour plan before the crusher starts.
Name the site facts
Dust, flying fragments and who walks the yard
People who did not read the pack
The named site stays in use around this on-site concrete crush job
What this document has to cover
This is not a diamond drilling RAMS. This job covers crushing concrete on a live site, and the control that keeps people safe is a silica, exclusion and neighbour plan before the crusher starts. If the RAMS never names dust, flying fragments and who walks the yard, a principal contractor will send it back.
An on-site concrete crush rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- People hurt if a silica, exclusion and neighbour plan before the crusher starts is skipped on this on-site concrete crush job
- On-site concrete crush left open so a passer-by reaches the hazard
- Wrong isolation so a sister on-site concrete crush stays live
- Manual handling or dropped parts on this on-site concrete crush job
- Weather, dust or a substance unique to crushing concrete on a live site
- The next crew inheriting an open on-site concrete crush hazard because handover was a text to nobody
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Hold point: a silica, exclusion and neighbour plan before the crusher starts
- Brief the dutyholder on dust, flying fragments and who walks the yard
- Set an exclusion that matches diamond drilling RAMS failing on this site
- Do the work to the sequence that keeps a silica, exclusion and neighbour plan before the crusher starts first
- Test or prove the critical control still holds
- Handover residual on-site concrete crush hazards in writing
Occupancy and other people
The named site stays in use around this on-site concrete crush job. Write dust, flying fragments and who walks the yard and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Substances used while crushing concrete on a live site
- Cleaning wipes specified for the finish
- Dust or residue from the opened plant
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer on-site concrete crush rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeGroundworks RAMSCreate a groundworks or excavation RAMS online: buried services, trench collapse, plant movement and public interface. Review every suggestion before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsSoft strip method statementWrite a soft strip method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this the same as a diamond drilling RAMS?
- No. A on-site concrete crush RAMS has to name dust, flying fragments and who walks the yard. A diamond drilling RAMS will not survive a competent review.
- Can we skip a silica, exclusion and neighbour plan before the crusher starts?
- No. A silica, exclusion and neighbour plan before the crusher starts is the hold point. Write it before the work step.
- Who writes dust, flying fragments and who walks the yard?
- The competent person who issues this on-site concrete crush rams. A sticky note is not a handover.
- Can AI issue this on-site concrete crush rams?
- A tool can draft a on-site concrete crush pack. A competent person reviews and issues it for this site.