Commercial kitchen installation RAMS

This is a live-services fit-out in a grease environment, not a domestic kitchen. Gas Safe, electrical isolation, heavy kit and the chef who wants the pass open at 12:00 all belong in the method.

Typical scope

  • Gas Safe / electrical competence
  • Zone still trading vs closed
  • Handling plan for heavy kit
  • Tightness and electrical tests
  • Ventilation interlock
  • Chef briefing on isolation

Quick answer

A commercial kitchen installation RAMS covers placing and connecting catering equipment: gas, electric, water, drainage and ventilation interfaces in a named kitchen. Competence, isolation and a still-trading restaurant are the usual issues.

Primary topic: commercial kitchen installation rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Domestic kitchen RAMS

    No three-phase, no Gas Safe tightness.

  • Relight to keep service

    Tests skipped.

  • Range slid on grease

    No handling plan.

Example

New range and canopy in a trading brasserie

Built from one job description. You review and adjust every item before issuing it.

Job description

Install a new range and connect to an existing canopy at Market Street Brasserie, Manchester, Monday 06:00–11:00. Kitchen closed to diners, Gas Safe tightness, three-phase isolation, two-person handling, chef briefed, no relight until tests pass.

Activities identified

  • General site work
  • Manual handling
  • Gas work

Method (8 steps)

  1. 1.Arrive and sign in. Arrive at Market Street, Manchester, report to the Market Street Brasserie site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Isolate the gas supply. Isolate the gas supply and carry out a tightness test before starting work.
  4. 4.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  5. 5.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  6. 6.Commission and test appliance. Tightness test, commission the appliance and complete flue checks before handover.
  7. 7.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  8. 8.Hand over and sign out. Hand over to the Market Street Brasserie site contact, report anything outstanding and sign out.

Main risks (2 in total)

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

Gas escape, fire or explosion

Residual Medium

Who: Operatives, occupants

  • Gas work only by Gas Safe registered engineers for the appliance category
  • Supply isolated and tightness tested before and after work
  • No ignition sources during work; area ventilated
  • Appliance commissioned and flue tested before handover

What to get right on this document

Competence on the pack

Gas and electric named.

Tests before relight

Service waits.

Heavy kit is a lift

Plan, not heroics.

What this document has to cover

This is a live-services fit-out in a grease environment, not a domestic kitchen. Gas Safe, electrical isolation, heavy kit and the chef who wants the pass open at 12:00 all belong in the method.

A commercial kitchen installation rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Gas release and incomplete tightness test
  • Electric shock on three-phase catering kit
  • Manual handling of ranges, hoods and cold rooms
  • Hot works or soldering on pipework
  • Slips on grease and water
  • Staff and public still using part of the kitchen or dining room

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Agree which appliances stay in service and which zones are excluded
  • Isolate gas, electric and water to the package; lock off
  • Position heavy kit with a handling plan — not a human chain over a wet floor
  • Connect, tightness-test, purge, electrically test as applicable
  • Commission ventilation interlocks if specified
  • Clean, brief the chef on isolation points, hand over certificates

Occupancy and other people

Restaurants often stay open with a reduced menu. Write the exclusion at the pass, how diners are kept out, and that you do not relight until tests pass — even if service is waiting.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Natural gas or LPG
  • Jointing compounds and flux
  • Cleaning chemicals on a grease floor
  • Refrigerant if cold rooms are in the package

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer commercial kitchen installation rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is canopy cleaning in this RAMS?
Only if you are doing it — otherwise attach the extract-clean method.
ANSUL / fire suppression?
If you break into it, add the specialist’s method and a permit.
Cold room in the same visit?
Add refrigerant and hygiene; do not hide it.
Can the breakfast chef stay?
Not in the exclusion while gas and heavy kit are live hazards.