Chiller replacement RAMS

These are heavy, high-value plant moves on roofs or in basements. The RAMS has to lead with the lift and isolations, not with ‘install new chiller’ as step one.

Typical scope

  • Appointed lift
  • Exclusion below
  • Recovery before break-in
  • Electrical isolation
  • Weather limits
  • Commissioning

Quick answer

A chiller replacement RAMS is for swapping packaged or plant-room chillers: crane or roller skates, refrigerant recovery, electrical and water isolation, and working around live plant.

Primary topic: chiller replacement rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Lift plan missing

    ‘Use a crane’ with no radius or exclusion.

  • Glycol dumped

    Drain-down not in the method.

  • Old chiller left as a trip

    No removal step.

Example

Roof chiller swap over a car park

Built from one job description. You review and adjust every item before issuing it.

Job description

Replace two air-cooled chillers on the plant deck at Lakeside Retail, Thurrock. Sunday crane lift, car-park exclusion, recover R134a, isolate electrical and water, commission overnight.

Activities identified

  • General site work
  • Electrical isolation
  • Refrigerant handling
  • Manual handling
  • Lifting operations
  • Occupied premises or public areas

Method (14 steps)

  1. 1.Arrive and sign in. Arrive at Lakeside Retail, Thurrock, report to the Lakeside FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up the work area. Set up barriers and signage around the work area and keep it clear of other people.
  4. 4.Isolate the electrical supply. Identify the relevant circuit, isolate, lock off and tag. Prove dead with an approved voltage indicator, proved before and after use.
  5. 5.Carry out the lift. Carry out lifts to the lift plan, with the exclusion zone in place and a trained slinger/signaller directing.
  6. 6.Recover refrigerant. Recover the refrigerant into a correctly rated, labelled recovery cylinder. Record quantities in line with F-gas requirements.
  7. 7.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
  8. 8.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
  9. 9.Pressure test and evacuate. Pressure test with oxygen-free nitrogen, then evacuate the system before charging.
  10. 10.Charge the system. Charge the system with refrigerant to the manufacturer's specification and leak test all joints.
  11. 11.Test and commission. Test and commission the installation. Record results.
  12. 12.Remove isolation and re-energise. Confirm the work is complete and everyone is clear, remove locks and re-energise.
  13. 13.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  14. 14.Hand over and sign out. Hand over to the Lakeside FM site contact, report anything outstanding and sign out.

Main risks (6 in total)

Electric shock or burns

Residual Medium

Who: Operatives, building occupants

  • Work carried out dead — no live working
  • Safe isolation: isolate, lock off, tag, and prove dead with an approved voltage indicator (GS38) proved before and after
  • Only competent, qualified electricians carry out electrical work
  • Permit to work obtained where the site requires one
  • Personal locks and keys retained by the person working

Refrigerant release

Residual Low

Who: Engineers, building occupants

  • Refrigerant handled only by F-gas certified engineers
  • Refrigerant recovered into correctly rated, labelled recovery cylinders — never vented
  • Good ventilation; no recovery work in enclosed spaces without assessment
  • No ignition sources near flammable (A2L/A3) refrigerants; leak detector in use
  • Cryogenic-rated gloves and eye protection when connecting hoses

Stored pressure

Residual Low

Who: Engineers

  • Systems depressurised and drained down before breaking into pipework
  • Gauges, hoses and valves inspected and rated for the system pressure
  • Cylinders secured upright and transported with valves protected
  • Eye protection worn when connecting or venting

Manual handling

Residual Medium

Who: Operatives

  • Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
  • Team lifts for items too heavy or awkward for one person
  • Route planned and cleared before moving items
  • Operatives trained in safe lifting techniques
  • Gloves with good grip and safety footwear

+ 2 more risks in the full RAMS.

What to get right on this document

The lift is the job

Plant, radius, banksman and exclusion first.

Recover then break

Do not open circuits full of refrigerant.

Public below

If the deck is over a car park, write that exclusion.

What this document has to cover

These are heavy, high-value plant moves on roofs or in basements. The RAMS has to lead with the lift and isolations, not with ‘install new chiller’ as step one.

A chiller replacement rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Catastrophic lift failure / dropped load
  • Work at height on plant decks
  • Refrigerant and glycol release
  • Electrical isolation of large loads
  • Stored pressure in water circuits
  • Noise and public interface on a live building

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Lift plan, exclusion and weather limits agreed
  • Isolate electrical, water and controls; recover refrigerant
  • Disconnect, drain and prepare the old machine
  • Lift out / skate out, then position the new chiller
  • Reconnect, charge, leak-test and commission
  • Remove the old unit and reinstate edge protection

Occupancy and other people

Retail parks and hospitals stay open. Ground-level exclusion under a roof lift is as important as the roof itself.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Refrigerant
  • Glycol / inhibitor
  • Oils from compressors

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer chiller replacement rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Do I need a separate lifting RAMS?
A combined RAMS is fine if the lift plan is attached and the sequence is honest.
What if the weather turns?
Write abort criteria — wind limits are a control.
Glycol COSHH?
Yes if you drain or refill.
Live chillers nearby?
Include residual noise, heat and trip hazards from plant that stays running.