RAMS by job · UK
Carpet tile laying RAMS
Tiles look simple until a pallet sits in a stair and tackifier goes down in a live aisle. A vinyl RAMS that never mentions pile direction, raised-floor pedestals or the people still walking the floor will fail FM.
Typical scope
- Phased walking route
- Escape kept clear of pallets
- Pile direction set out
- Tackifier COSHH
- Raised-floor holes guarded
- Pallets off the floor same day
Quick answer
A carpet-tile RAMS covers setting out and laying modular carpet on a named office floor. Manual handling, adhesive or tackifier COSHH, and not blocking an occupied escape with pallets are the usual harms.
Primary topic: carpet tile rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
Vinyl RAMS reused
Wrong adhesive, no pile.
Pallet in the stair
Escape.
Whole floor tackified at 09:00
No walking route.
Example
Phased tiles on a live office floor
Built from one job description. You review and adjust every item before issuing it.
Job description
Lay carpet tiles on level 2 at Greyfriars House, Leicester. Half the floor at a time, escape via the east stair, tackifier COSHH, raised-floor panels guarded, pallets in the loading bay not the lobby, desks live on the west side.
Activities identified
- General site work
- Manual handling
- Plant and vehicle movement
Method (6 steps)
- 1.Arrive and sign in. Arrive at Level 2, Greyfriars House, Leicester, report to the Greyfriars FM site contact, sign in and complete any site induction.
- 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
- 3.Disconnect and remove existing equipment. Disconnect and remove the existing equipment. Lower or carry it using mechanical aids or team lifts as planned.
- 4.Install new equipment. Position and fix the new equipment to the manufacturer's instructions.
- 5.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
- 6.Hand over and sign out. Hand over to the Greyfriars FM site contact, report anything outstanding and sign out.
Main risks (2 in total)
Manual handling
Residual MediumWho: Operatives
- Use mechanical aids (trolleys, sack trucks, hoists) for heavy items
- Team lifts for items too heavy or awkward for one person
- Route planned and cleared before moving items
- Operatives trained in safe lifting techniques
- Gloves with good grip and safety footwear
Moving vehicles and plant
Residual MediumWho: Operatives, public, site staff
- Pedestrians segregated from vehicle and plant routes
- Plant operated by trained, authorised operators only
- Banksman used for reversing and manoeuvring
- High-visibility clothing worn
What to get right on this document
Leave a way through
Phase it.
Pallets are a fire and escape load
Out the same day.
Tackifier is COSHH
Ventilate and exclude.
What this document has to cover
Tiles look simple until a pallet sits in a stair and tackifier goes down in a live aisle. A vinyl RAMS that never mentions pile direction, raised-floor pedestals or the people still walking the floor will fail FM.
A carpet tile rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- Trips on loose tiles and open raised-floor panels
- Manual handling of heavy tile pallets
- Tackifier or adhesive vapour in an occupied office
- Pallets blocking an escape
- Dust from scraping old adhesive
- Occupants walking the wet tackifier
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Agree a phased floor so an escape and a walking route remain
- Protect and isolate the bay; do not open a raised floor you cannot guard
- Set out pile direction; lay to the grid
- Tackifier to the COSHH; exclude until it grabs
- Cut in a bay, not on the escape
- Remove pallets and offcuts the same day
Occupancy and other people
Offices stay at desks. Write the walking route and that night cleaners will not see a wet tackifier without signs.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- Tackifier / adhesive
- Old adhesive scrapings
- Tile offcuts (not a COSHH story — still waste)
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer carpet tile rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- RAMS by tradeFlooring RAMSCreate floor preparation method statement online for UK sites. Suggested risks and method steps matched to the job — you review every item before issue.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- Method statementsFit-out method statementWrite a fit out method statement for a named UK site. Clear sequence, interfaces and controls — review before issue.
- RAMS by jobConsumer unit replacement RAMSCreate a consumer unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEV charger installation RAMSCreate a ev charger installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobLighting rewire RAMSCreate a lighting rewire rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobEICR testing RAMSCreate a eicr method statement for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobRooftop condenser replacement RAMSCreate a rooftop ac unit replacement rams for a named UK site. Suggested risks and method steps you review before download or issue.
- RAMS by jobSplit system installation RAMSCreate a split system installation rams for a named UK site. Suggested risks and method steps you review before download or issue.
Questions
- Is this vinyl sheet?
- No — modular tiles and tackifier, different closedown.
- Do I need to close the floor?
- Phase it so a route remains — write the phase.
- Old bitumen adhesive?
- Survey before scrape — it can be asbestos-containing.
- Who owns the colour/pile plan?
- The drawing — do not rotate tiles to use remnants against the design.