Brewery glycol loop RAMS

This is not a chilled-water RAMS. This job covers altering a glycol cooling loop on a live brewery, and the control that keeps people safe is isolation of the loop and a written product-protection plan before any joint is opened. If the RAMS never names which tanks stay cold, the food-area rules and who owns the brew, a principal contractor will send it back.

Typical scope

  • Isolation of the loop and a written product-protection plan before any joint is opened as a hold point
  • Which tanks stay cold, the food-area rules and who owns the brew named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A brewery glycol loop rams covers altering a glycol cooling loop on a live brewery on a named UK site. The critical control is isolation of the loop and a written product-protection plan before any joint is opened. Write which tanks stay cold, the food-area rules and who owns the brew into the sequence — a pack that could describe any chilled-water RAMS will not survive a competent review.

Primary topic: brewery glycol loop rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • chilled-water RAMS reused

    No isolation of the loop and a written product-protection plan before any joint is opened.

  • Critical control buried

    Which tanks stay cold, the food-area rules and who owns the brew belongs in the sequence.

  • Occupancy ignored

    The closed cellar and that a tour still walks the gallery.

Example

Brewery glycol loop on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Altering a glycol cooling loop on a live brewery at Cellar 2, Staithes Brew Co, Whitby. Tuesday no-brew day 07:00–18:00. Isolation of the loop and a written product-protection plan before any joint is opened; which tanks stay cold, the food-area rules and who owns the brew; the closed cellar and that a tour still walks the gallery.

Activities identified

  • General site work
  • Confined space

Method (5 steps)

  1. 1.Arrive and sign in. Arrive at Cellar 2, Staithes Brew Co, Whitby, report to the Staithes Brew Co site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Confined space permit and gas test. Obtain the permit to work, test the atmosphere and confirm rescue arrangements before anyone enters.
  4. 4.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  5. 5.Hand over and sign out. Hand over to the Staithes Brew Co site contact, report anything outstanding and sign out.

Main risks (1 in total)

Confined space

Residual Medium

Who: Operatives, rescuers

  • Avoid entry — do the work from outside where possible
  • Permit to work and confined space trained operatives
  • Atmosphere tested before and during entry with a calibrated gas monitor
  • Emergency rescue arrangements in place before entry

What to get right on this document

Critical control first

Put this hold point first: isolation of the loop and a written product-protection plan before any joint is opened.

Name the site facts

Which tanks stay cold, the food-area rules and who owns the brew

People who did not read the pack

Brew days do not pause

What this document has to cover

This is not a chilled-water RAMS. This job covers altering a glycol cooling loop on a live brewery, and the control that keeps people safe is isolation of the loop and a written product-protection plan before any joint is opened. If the RAMS never names which tanks stay cold, the food-area rules and who owns the brew, a principal contractor will send it back.

A brewery glycol loop rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • Glycol leak into product
  • Unexpected start of a pump
  • CO2 in cellars as a sister hazard
  • Slip on wet cellar floors
  • Confined cellar work without atmosphere checks
  • Restoring flow so a fermenter warms

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Brewers agree which tanks can warm
  • Isolate, drain and lock the named loop
  • Break joints over catch trays — not over open product
  • Remake, leak-test, restore to the brew schedule
  • Hygiene clean as the site requires
  • Brewer signs the loop back

Occupancy and other people

Brew days do not pause. Write the closed cellar and that a tour still walks the gallery as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Glycol
  • Jointing compound
  • Cellar cleaning agents

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer brewery glycol loop rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a chilled-water RAMS?
No. A brewery glycol loop RAMS has to name which tanks stay cold, the food-area rules and who owns the brew. A chilled-water RAMS will not survive a competent review.
Can we skip isolation of the loop and a written product-protection plan before any joint is opened?
No. Isolation of the loop and a written product-protection plan before any joint is opened is the hold point. Write it before the work step.
Who writes which tanks stay cold, the food-area rules and who owns the brew?
The competent person who issues this brewery glycol loop rams. A sticky note is not a handover.
Can AI issue this brewery glycol loop rams?
A tool can draft a brewery glycol loop pack. A competent person reviews and issues it for this site.