Bitumen torch-on RAMS

This is not a hot works RAMS. This job covers torching bitumen felt on a named roof, and the control that keeps people safe is a hot-works permit and fire watch before the first flame. If the RAMS never names fire into the building, the edge and who is below, a principal contractor will send it back.

Typical scope

  • A hot-works permit and fire watch before the first flame as a hold point
  • Fire into the building, the edge and who is below named
  • Exclusion that actually holds
  • Sequence that cannot skip the critical control
  • Handover of residual hazards
  • Review before issue — not a stamp

Quick answer

A bitumen torch-on rams covers torching bitumen felt on a named roof on a named UK site. The critical control is a hot-works permit and fire watch before the first flame. Write fire into the building, the edge and who is below into the sequence — a pack that could describe any hot works RAMS will not survive a competent review.

Primary topic: bitumen torch-on rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • hot works RAMS reused

    Missing: a hot-works permit and fire watch before the first flame.

  • Critical control buried

    Fire into the building, the edge and who is below belongs in the sequence.

  • Occupancy ignored

    Fire into the building, the edge and who is below and that someone who did not read the pack will walk the exclusion.

Example

Bitumen torch-on on a named site

Built from one job description. You review and adjust every item before issuing it.

Job description

Torching bitumen felt on a named roof at Roof, Salisbury Close, Salisbury. Sunday 06:00–14:00. A hot-works permit and fire watch before the first flame; fire into the building, the edge and who is below; fire into the building, the edge and who is below and that someone who did not read the pack will walk the exclusion.

Activities identified

  • General site work
  • Roof work
  • Using chemicals or products

Method (7 steps)

  1. 1.Arrive and sign in. Arrive at Roof, Salisbury Close, Salisbury, report to the Salisbury Close FM site contact, sign in and complete any site induction.
  2. 2.Brief the team. Brief all operatives on this RAMS, the COSHH assessments and the emergency arrangements. Record attendance.
  3. 3.Set up exclusion zone below. Establish an exclusion zone below the work area with barriers and signage before any work at height starts.
  4. 4.Access the roof. Access the roof via the agreed route. Confirm edge protection is in place and identify any fragile areas before moving onto the roof.
  5. 5.Apply products. Apply products as described on the Safety Data Sheet and COSHH assessment, with ventilation and the specified PPE.
  6. 6.Clear up and remove waste. Clear the work area, remove waste from site (including recovered refrigerant and hazardous waste) and leave the area safe.
  7. 7.Hand over and sign out. Hand over to the Salisbury Close FM site contact, report anything outstanding and sign out.

Main risks (5 in total)

Fall from roof edge

Residual Medium

Who: Operatives

  • Plan work to be done from below or from a MEWP where possible
  • Edge protection (guard rails) or parapet of adequate height in place before work starts
  • Safe access route to the roof agreed with the site; roof hatch secured open
  • Where collective protection isn't possible, use a fall-restraint system with suitable anchors
  • Work stops in high winds, ice or heavy rain

Fall through fragile roof or rooflight

Residual Medium

Who: Operatives

  • Treat all roof sheets and rooflights as fragile unless confirmed otherwise by the site
  • Rooflights covered or protected with suitable mesh or barriers
  • Staging or crawling boards used; no walking directly on sheets
  • Safety netting or fall arrest below where required

Falling objects

Residual Low

Who: People below, other trades, public

  • Exclusion zone set up below the work area with barriers and signage
  • Tools tethered when working at height; materials kept away from edges
  • Banksman or second person controls the area during lifts and removals
  • Hard hats worn in the exclusion zone

Adverse weather

Residual Low

Who: Operatives

  • Forecast checked before work; work at height stopped in high winds
  • Breaks, water and shade in hot weather; warm clothing in cold
  • Sun protection on exposed work in summer

+ 1 more risks in the full RAMS.

What to get right on this document

Critical control first

Put this hold point first: a hot-works permit and fire watch before the first flame.

Name the site facts

Fire into the building, the edge and who is below

People who did not read the pack

The named site stays in use around this bitumen torch-on job

What this document has to cover

This is not a hot works RAMS. This job covers torching bitumen felt on a named roof, and the control that keeps people safe is a hot-works permit and fire watch before the first flame. If the RAMS never names fire into the building, the edge and who is below, a principal contractor will send it back.

A bitumen torch-on rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • People hurt if a hot-works permit and fire watch before the first flame is skipped on this bitumen torch-on job
  • Bitumen torch-on left open so a passer-by reaches the hazard
  • Wrong isolation so a sister bitumen torch-on stays live
  • Manual handling or dropped parts on this bitumen torch-on job
  • Weather, dust or a substance unique to torching bitumen felt on a named roof
  • The next crew inheriting an open bitumen torch-on hazard because handover was a text to nobody

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Hold point: a hot-works permit and fire watch before the first flame
  • Brief the dutyholder on fire into the building, the edge and who is below
  • Set an exclusion that matches hot works RAMS failing on this site
  • Do the work to the sequence that keeps a hot-works permit and fire watch before the first flame first
  • Test or prove the critical control still holds
  • Handover residual bitumen torch-on hazards in writing

Occupancy and other people

The named site stays in use around this bitumen torch-on job. Write fire into the building, the edge and who is below and that someone who did not read the pack will walk the exclusion as occupancy control, not a hope.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Substances used while torching bitumen felt on a named roof
  • Cleaning wipes specified for the finish
  • Dust or residue from the opened plant

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer bitumen torch-on rams document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All rams by job · RAMS by trade · Free RAMS generator

Questions

Is this the same as a hot works RAMS?
No. A bitumen torch-on RAMS has to name fire into the building, the edge and who is below. A hot works RAMS will not survive a competent review.
Can we skip a hot-works permit and fire watch before the first flame?
No. A hot-works permit and fire watch before the first flame is the hold point. Write it before the work step.
Who writes fire into the building, the edge and who is below?
The competent person who issues this bitumen torch-on rams. A sticky note is not a handover.
Can AI issue this bitumen torch-on rams?
A tool can draft a bitumen torch-on pack. A competent person reviews and issues it for this site.