Process-generated dusts — silica, wood and welding fume

People attach an SDS for ‘plywood’ or ‘mild steel’ and think they have assessed the cut. The assessment is the saw, the weld and the room — not the unused board in the rack.

On this page

  • Process named
  • SDS is an input
  • Extract first
  • Occupants excluded
  • RPE residual
  • Review on change

Quick answer

Process-generated substances are created by cutting, sanding or welding. There may be no neat bottle. COSHH still applies to the dust or fume you actually make, who breathes it and for how long.

Primary topic: process generated dust coshh. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.

What usually goes wrong

These are the operational gaps that make generic Word RAMS fail on the next site.

  • Board SDS as the cut assessment

    Wrong task.

  • Dry sweep

    Silica.

  • RPE only

    Hierarchy skipped.

What to get right on this document

The process is the substance

Cut, grind, weld.

SDS ≠ COSHH

Especially when there is no bottle.

Occupants count

Monday morning.

What this document has to cover

People attach an SDS for ‘plywood’ or ‘mild steel’ and think they have assessed the cut. The assessment is the saw, the weld and the room — not the unused board in the rack.

A process generated dust coshh only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.

Typical hazards to assess on this job

  • SDS for the unused product treated as the fume assessment
  • Dry sweeping silica
  • Welding in a closed plant room with no extract
  • Hardwood dust copied from a softwood sheet
  • Occupants returning to a dusty classroom
  • RPE as the only control

Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.

A method sequence that actually protects people

Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.

  • Name the process — cut, grind, weld — and the room
  • Read any SDS that exists, then assess the fume or dust you generate
  • Extract or wet methods first
  • RPE as residual control
  • Exclude occupants
  • Review when the process changes

Occupancy and other people

Classrooms and offices stay occupied. A holiday cut still has a Monday morning.

Substances and COSHH

An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:

  • Silica from stone or block
  • Wood dust from the actual timber
  • Welding fume from the actual process

How SafeForJob helps

  • Describe this job in plain English and get suggested activities, risks and method steps
  • Edit every line before you download or issue
  • Reuse a previous RAMS and catch old client or site names
  • Attach or create COSHH assessments where hazardous substances appear

What this page is not

This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer process generated dust coshh document for a named job. You remain responsible for reviewing and issuing it.

Related reading

See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.

Related pages

All guides · RAMS by trade · Free RAMS generator

Questions

Is wood dust COSHH if I have no can?
Yes if the work generates it. Assess the cut, the timber and who is exposed.
Is an SDS enough?
No. For process dusts the SDS of the unused product is only an input.
Is this medical advice?
No. Health surveillance sits with occupational health — not this page.
Where do I start?
Open the SDS reader for any product you have, then write the real task into a COSHH assessment.