Guides · UK
Hierarchy of controls in a RAMS (UK)
Clients and HSE inspectors look for whether you reduced the risk or just dressed for it.
On this page
- Eliminate
- Substitute
- Engineering
- Admin/sequence
- PPE specified
- Not slogans
Quick answer
The hierarchy of controls means you try elimination, substitution, engineering and administrative measures before relying on PPE. A RAMS that only lists gloves and boots is usually incomplete.
Primary topic: hierarchy of controls rams. UK contractors — review every document before you issue it. SafeForJob does not replace competent judgement or HSE guidance.
What usually goes wrong
These are the operational gaps that make generic Word RAMS fail on the next site.
PPE list as the risk assessment
Upside down.
Careful operatives
Not a control.
Extract in COSHH, absent in method
Won’t happen.
What to get right on this document
Sequence is engineering/admin
Isolation before work.
PPE has a spec
Type, not ‘suitable’.
Put extract in the method
If COSHH relies on it.
What this document has to cover
Clients and HSE inspectors look for whether you reduced the risk or just dressed for it.
A hierarchy of controls rams only holds up if it names the site, the people at risk, the critical control, and the order of work. Principal contractors reject paragraphs that could apply to any job of this type.
Typical hazards to assess on this job
- PPE-only RAMS
- ‘Care will be taken’ as a control
- Extract promised but not in the method
- No mention of isolation as elimination of live working
Likelihood and severity change with occupancy, access, weather and other trades. Copying last month’s scores without looking at this site is how people get hurt.
A method sequence that actually protects people
Write the sequence so the critical control cannot be skipped. If isolation, edge protection or service location is the difference between safe and unsafe, it belongs before the work step — not in a general ‘PPE will be worn’ line.
- Can we avoid the hazard (off-site cut, void the space)?
- Substitute (water-based, colder system)
- Engineer (extract, edge protection, RCD)
- Admin (permits, exclusion, sequence)
- PPE last, specified
Occupancy and other people
In occupied buildings, engineering often means local extract and physical barriers, not hoping people stay back.
Substances and COSHH
An SDS is an input, not a COSHH assessment. If these substances appear on the job, attach assessments that describe quantity, duration, who is exposed and the controls you will actually use:
- COSHH uses the same hierarchy
How SafeForJob helps
- Describe this job in plain English and get suggested activities, risks and method steps
- Edit every line before you download or issue
- Reuse a previous RAMS and catch old client or site names
- Attach or create COSHH assessments where hazardous substances appear
What this page is not
This page is not HSE approval, legal advice or a substitute for competent judgement. It helps you draft a clearer hierarchy of controls rams document for a named job. You remain responsible for reviewing and issuing it.
Related reading
See what a RAMS is, the free RAMS generator, and HSE guidance on managing risks.
Related pages
- GuidesHow to write a RAMSA practical sequence: describe the job, list hazards, choose controls, write the method, check names. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a COSHH assessment?COSHH assessments explain how you control hazardous substances for a real task, using the SDS. Practical UK guidance for contractors — with links to free tools.
- GuidesWhat is a RAMS?RAMS means risk assessment and method statement — usually one site-specific pack for a construction or maintenance job. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS vs method statementHow the risk assessment and method statement fit together, and when clients ask for a combined RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesSDS vs COSHH assessmentWhy a safety data sheet informs but does not replace your COSHH assessment. Practical UK guidance for contractors — with links to free tools.
- GuidesWorking at height in RAMSHow to describe access equipment, fragile surfaces and rescue thinking inside a RAMS. Practical UK guidance for contractors — with links to free tools.
- GuidesCDM and RAMS responsibilitiesHow contractors use RAMS under CDM without pretending software assigns legal duties. Practical UK guidance for contractors — with links to free tools.
- GuidesRAMS for occupied premisesExtra controls when residents, staff, patients or customers stay in the building. Practical UK guidance for contractors — with links to free tools.
Questions
- Is PPE useless?
- No — it is last, and it must be the right type.
- Where is this in law?
- COSHW and MHSWR expect control in this spirit; this page is guidance not advice.
- How does SafeForJob help?
- Suggested controls are labelled by hierarchy so you can see if you only picked PPE.
- What is elimination on a roof?
- Sometimes ‘don’t go there’ — do the work from below or off-site.